BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 12, 2025 at 8:00 PM

Updated August 13, 2025

Site work for a road / highway in Winnipeg, Manitoba. Completed plans call for site work for a road / highway.

All enquiries regarding the Work may be made to: Ian McConnell Manager - Traffic Signals and Navigational Aids 420-215 Garry Street Winnipeg, MB R3C 3P3 (204) 803-0019 Ian.McConnell@gov.mb.ca The following office will administer the tendering and contract award process. Enquiries regarding tendering or contract award may be made to: Manitoba Transportation and Infrastructure Traffic Engineering 420-215 Garry Street Winnipeg, MB R3C 3P3 204-945-3781 The Work of this Tender No. X21178 is generally described below: SECTION I - Flin Flon, Traffic Signals at Provincial Trunk Highway (PTH) 10 at 1st Ave: Underground work - Installation of concrete bases, pull pits, and electrical conduits. SECTION II - Flin Flon, Traffic Signals at Provincial Trunk Highway (PTH) 10 at 4th Ave: Underground work - Installation of concrete bases. Bituminous Pavement - Removal of existing asphalt and resurfacing intersection. The estimated contract period will be 0 month(s), with a proposed start date of 2025/08/27. Official bid documents must be obtained from www.merx.com Question Acceptance Deadline : 2025/08/07 01:00:00 PM EDT Award is subject to final approval

Award

Roads / Highways

$522,500.00

Public - State/Provincial

Site Work

9

3

2

2

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
43
Active Projects
2
Bidding Soon
337
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 11, 2025

August 27, 2025

Project location map

Multiple Locations, Winnipeg, MB


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.