BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 30, 2025 at 8:00 PM

Updated October 1, 2025

Site work and paving for a road / highway in Odenville, Alabama. Completed plans call for site work for a road / highway; and for paving for a road / highway.

As of September 30, 2025, this project has not yet been awarded. A timeline for award has not yet been established. This Bracket Range is Shown Only to Provide General Financial Information to Contractors and Bonding Companies Concerning the Projects Complexity and Size. This Bracket Should Not Be Used in Preparing a Bid, Nor Will This Bracket Have Any Bearing on the Decision to Award the Contract. The Alabama Street & Tucker Road Resurfacing Project Consists of Resurfacing 1.1 Miles Along Portions of Alabama Street and Tucker Road in Odenville, Al. Project Includes Bituminous Wearing Surface Overlay (Approximately 1,175 Tons), Select Milling (Approximately 8,000 Square Yards), Bituminous Binder Widening (Approximately 70 Tons), Bituminous Binder Patching (Approximately 300 Tons), and Bituminous Leveling (Approximately 100 Tons). Project Also Includes Removal of a Deficient 60 Cast Iron Culvert Pipe and Replacement With 32 Linear Feet of 60 Rcp Roadway Pipe. Other Items Included in This Project Are Traffic Striping, Markings/legends, Pavement Markers, and Associated Traffic Control/erosion Control. a Cashiers Check (Drawn on an Alabama Bank) or Bid Bond for 5% of the Amount Bid (Maximum of $10,000.00) and Made Payable to the City of Odenville Must Accompany Each Bid as Evidence of Good Faith. The Entire Project Shall Be Completed in Thirty-five (35) Working Days. Estimate on This Project is From $380,000.00 to $440,000.00. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. This Bracket Range is Shown Only to Provide General Financial Information to Contractors and Bonding Companies Concerning the Project's Complexity and Size. This Bracket Should Not Be Used in Preparing a Bid, Nor Will This Bracket Have Any Bearing on the Decision to Award the Contract. The Right to Reject Any or All Bids and to Disregard Any Minor Irregularities is Reserved by the Owner

Award

Roads / Highways

$355,955.00

Public - City

Paving, Site Work

27

6

4

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
133
Active Projects
68
Bidding Soon
762
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 13, 2025

September 22, 2025

Project location map

Alabama St & Tucker Rd, Odenville, AL


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.