Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published September 29, 2025 at 8:00 PM
Updated September 30, 2025
Site work for a water / sewer project in Earl Park, Indiana. Completed plans call for site work for a water / sewer project.
3% IVOSB participation The contract will consist of the following: In general, the work to be completed for the Town of Earl Park Water System Improvements project involves the construction of approximately 5,315 lineal feet of 6-inch water main (directionally drilled); 175 lineal feet of 6-inch water main (open-cut), 8-inch, 6-inch and 4-inch tapping valves and sleeves, 6-inch gate valves; new fire hydrant assemblies; replacement of existing fire hydrant assemblies with new assemblies; abandonment of existing valves; installation of new 36-inch service lines via directional drilled and open-cut; 2-inch service lines installed via open-cut; reconnection of service lines to existing water meters; and other associated items necessary to complete the work as shown in the plans and detailed in the specifications. Each bid shall be accompanied by a certified check or acceptable bidder's bond made payable to the Owner, in a sum of not less than five percent (5%) of the total amount of the highest aggregate bid, which check or bond will be held by the Owner as evidence that the bidder will, if awarded the contract, enter into the same with the Owner upon notification from him to do so within ten (10) days of said notification. Approved performance and payment bonds guaranteeing faithful and proper performance of the work and materials, to be executed by an acceptable surety company, will be required of the Contractor at the time he executes his contract. The bond will be in the amount of 100% of the Contract Price and must be in full force and effect throughout the term of the Construction Contract plus a period of twelve (12) months from the date of substantial completion. The Owner reserves the right to reject any bid, or all bids, or to accept any bid or bids, or to make such combination of bids as may seem desirable, and to waive any and all informalities in bidding. Any bid may be withdrawn prior to the above scheduled time for the opening of bids or authorized postponement thereof. Any bid received after the time and date specified shall not be considered. No bid may be withdrawn after the scheduled closing time for receipt of bids for at least ninety (90) days. A conditional or qualified Bid will not be accepted. Award will be made to the low, responsive, responsible bidder. The low, responsive, responsible bidder must not be debarred, suspended, or otherwise be excluded from or ineligible for participation in federally assisted programs under Executive Order 12549 All applicable laws, ordinances, and the rules and regulations of all authorities having jurisdiction over construction of the projects shall apply to the Projects throughout. Bids shall be properly and completely executed on bid forms included in the Specifications. Bids shall include all information requested by Indiana Form 96 (Revised 2013) included with the Specifications. Under Section III of Form 96, the Bidder shall submit a financial statement. A copy of the proposed Financial Statement to be submitted with the bid is included in the bid documents section to these specifications. The Owner may make such investigations as deemed necessary to determine the ability. ability of the Bidder to perform the work and the Bidder shall furnish to the Owner all such information and data for this purpose as the Owner may request. The Owner reserves the right to reject any bid if the evidence submitted by, or investigation of, such Bidder fails to satisfy the Owner that such Bidder is properly qualified carry out the obligations of the Agreement and to complete the work contemplated therein. Each Bidder is responsible for inspecting the Project site(s) and for reading and being thoroughly familiar with the Contract Documents and Specifications. The failure or omission of any Bidder to do any of the foregoing shall in no way relieve any Bidder from any obligation with respect to its Bid.Bidder is required to submit with bid a written plan for an employee drug testing program that complies with IC 4-13-18-5 and IC 4-13-18-6. Wage rates on the project shall not be less than the Federal wage scale published by the U.S. Department of Labor. Bidders on this work shall be required to comply with the provisions of the President's Executive Order No. 11246, as amended. The Bidders shall also comply with the requirements of 41 CFR Part 60-4 entitled Construction Contractors-Affirmative Action Requirements. A copy of 41 CFR Part 60-4 may be found in the Supplemental General Conditions of the Contract Documents and Specifications. Bidders shall be aware of the requirements set by the Bipartisan Infrastructure Law of 2021, which mandate that all iron and steel, manufactured products, and construction materials used in a federal project must be produced in the United States. Pursuant to HUD's Notice, "Public Interest Phased Implementation Waiver for FY 2022 and 2023 of Build America, Buy America (BABA) Provisions as Applied to Recipients of HUD Federal Financial Assistance" (88 FR 17001), any funds obligated by HUD on or after the applicable listed effective dates, are subject to BABA requirements, unless excepted by a waiver. The Bidders attention is also called to the "Minority/Women Owned Business Participation" and "Indiana Veteran Owned Small Business Program" requirements contained in the Project Specifications. The State of Indiana has set a goal of 10% participation for minority and women owned. businesses and 3% participation of veteran owned businesses for construction or purchase related contracts for the work. The Contractor must meet guidelines and practices established by the Indiana Office of Community and Rural Affairs and appropriate federal regulations including: 1) Executive Order 11246, 2) Section 3 of the Housing and Community Development Act of 1968, as amended, 3) Certification of Non-Segregated Facilities, 4) OMB Circular A-102, 5) Title VI of the Civil Rights Act of 1964, 6) Section. 504, Rehabilitation Act of 1973, 7) Age Discrimination Act of 1975, 8) Executive Order 12138, 9) Conflict of Interest Clause, 10) Retention and Custodial Requirements for Records Clause, 11) Contractors and Subcontractors Certifications, 12) Build America, Buy America Act (BABAA) requirements under Title IX of the infrastructure Investment and Jobs Act ("IJA"), Pub. L. 177-58, 13) OMB's Memorandum M-24-02: Implementation Guidance on Application of Buy America Preference in Federal Financial Assistance Programs for Infrastructure, 14) U.S. Housing and Urban Development CPD Notice 23-12: CPD Implementation Guidance for the Build America, Buy America Act's domestic content procurement preference as part of the infrastructure Investment and Jobs Act and others that may be appropriate or necessary. Contract procurement is subject to the federal regulations contained in the OMB Circular A-102, Sections B and O and the State of IN requirements contained in IC-36-1-9 and IC-36-1-12. Any contract(s) awarded under this Advertisement for Bids are expected to be funded in part by a grant. from the Department of Housing and Urban Development, as administered by the IN Office of Community and Rural Affairs. Neither the United States nor any of its departments, agencies or employees is or will be a party to this Advertisement for Bids or any resulting contract. Question Deadline 08/20/2025 at 4:00 PM ET Bidders shall submit all questions to the Engineer in writing via email to Keegan Dunn, P.E. at: kdunn@hwcengineering.com
Award
Water / Sewer
$1,168,021.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
