Demolition, site work and new construction of a mixed-use development in Winchester, Kentucky. Completed plans call for site work for a water / sewer project; for the demolition of a water / sewer project; for the construction of a water / sewer project; and power facility.

Construction of a new raw water intake and pump station to transport raw water from the Kentucky River to EKPC's J.K. Smith power plant in Winchester, KY. The project shall consist of constructing one new wedge wire intake screen in the Kentucky River, one 10-inch DI intake pipe in a steel casing pipe, cast-in-place wet well, pump station building including two vertical turbine pumps and appurtenances, screen air cleaning system, and all associated piping, valves, electrical and instrumentation and HVAC, and crushed stone access drive including clearing and grading, together with all related work as specified and shown on the Drawings. The project shall also include demolition of the existing raw water intake pump station and electrical equipment. Contractor shall furnish a performance and payment bond in an amount at least equal to the Contract Price as security for the faithful performance and payment of all of Contractor's obligations under the Agreement no later than ten (10) Days after award of Agreement. The bond shall remain in effect at least until one year after the date when final payment becomes due, except as otherwise provided by Applicable Law or by the Agreement. EKPC reserves the right to accept and/or reject any and all proposals. Bidder may not claim any indemnity, nor may bidder contest for whatever reason, the choice made by EKPC. Limited Notice to Proceed 09/12/2025 8. Award Contract 10/17/2025 9. Start Construction 10/27/2025 Complete Construction 7.30.2027 Question Deadline 08/08/2025 Refer all bidding questions to Project Controls; EKCONRFP@ekpc.coop. After contract award questions relating to this project shall be directed to Weston Cline, PE, Project Manager at the EKPC Corporate Office in Winchester. Phone: (859) 300-4871 E-mail: wes.cline@ekpc.coop PN - 5239

Award

Water / Sewer

$900,000.00

Public - County

Demolition, New Construction, Site Work

95

31

7

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
154
Active Projects
93
Bidding Soon
850
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 14, 2025

October 27, 2025

Project location map

Multiple Locations, Winchester, KY

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.