Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published October 13, 2025 at 8:00 PM
Updated October 14, 2025
Site work for a water / sewer project in Angola, Indiana. Completed plans call for site work for a water / sewer project.
As of October 13, 2025, this project has been awarded. The Steuben Lakes Regional Waste District ("District") by and through its Board of Trustees ("Board") found that adopting and utilizing the authority provided under Indiana Code 5-23 will enhance the District's ability to deliver essential public infrastructure and services in an ancient, cost-effective, and timely manner. In accordance with IC 5-23-1-1 the Board, as the governmental body of the District, adopted an ordinance authorizing the District to utilize the use of public-private agreements as provided therein for the design, construction, nancing, lease, acquisition, improvement, renovation, ownership, management, operation, or transfer of any public facility or infrastructure used or to be used by the District in connection with its statutory duties The Project consists of the replacement of up to nine (g) existing sanitary pump stations serving the District's existing wastewater collection system. Upgrades will be constructed at multiple pump stations including: Pump Stations No. 6. No. 12, No. 14. No. 23. No. 4. No. 19, No. 16. No. 8, and No. 18. The scope of the improvements at each pump station includes but is not limited to the following demolition and replacement of existing pumps, piping, electrical conduit, and appurtenances from existing wet wells and valve vaults. demolition and installation of new control panels and level control systems, and reconnection of proposed piping to existing force main and pressure sewer piping. The improvements at each pump station will require bypass pumping during the periods in which the pump station improvements are taking place. It is intended that the Project will include improvements to as many stations as can be completed within the District's budget. The stations will be prioritized as follows Base Bid - Pump Stations No. 6. No. 12, No. 14, and No. 23. Mandatory Alternate Bid No. 1 - Pump Station No. 4 Mandatory Alternate Bid No. 2 - Pump Station No. 19 Mandatory Alternate Bid No. 3- Pump Station No. 16 Mandatory Alternate Bid No. 4- Pump Station No. 8 Mandatory Alternate Bid No. 5-Pump Station No.18 Finalize GMP Budget & Agreement October 2025 Anticipated Notice to Proceed February 2026 Anticipated Final Completion November 2027 The chosen respondent must provide both a payment bond and a performance bond, each equal to no less than one hundred percent (100%) of the Project's cost. Notwithstanding the above, the District reserves the right, under IC 5-23-5-8, to end this RFQ/P process at any time without awarding an agreement to any respondent. Est.value- $5,000,000 to $7,000,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Award
Water / Sewer
$7,000,000.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
