Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published September 10, 2025 at 8:00 PM
Updated September 13, 2025
Renovation of a military facility in Hartford, Connecticut. Completed plans call for the renovation of a military facility.
Hartford Armory Room 123 Renovations1. Renovation of an existing space of approximately 1,591 gross square feet. 2. The building is existing and shallbe renovated of materials that include but are not limited to the following: The structure shall consist of existingspaces with new wall partitions. Interior finishes 1. Renovation of an existing space of approximately 1,591 gross square feet. 2. The building is existing and shall be renovated of materials that include but are not limited to the following: The structure shall consist of existing spaces with new wall partitions. Interior finishes include painted gypsum wallboard, carpet tile, VCT, and acoustical ceiling tiles. Floor coverings include carpet tile and VCT. Ceilings shall be acoustical ceiling tiles. The HVAC system shall be removed and replaced. New electrical outlets for power and data will be added. 3. The Authorities Having Jurisdiction for Threshold Projects, Non-Threshold Projects, as defined by the Connecticut General Statutes, are the Connecticut Department of Administrative Services (DAS) / Construction Services (CS) Office of State Building Inspector (OSBI) and Office of State Fire Marshal (OSFM). Contract Time Allowed: Calendar Days: 270 Liquidated Damages: $ 839.00 Per Calendar Day Beyond Substantial Completion. $ 839.00 Per Calendar Day Beyond 90 days After Substantial Completion. SBE / MBE Subcontract Goals: SBE Subcontractors &/or Suppliers: 25%; MBE Subcontractors &/or Suppliers: 6.25% Cost Estimate Range: $ 500,000.00 To $ 700,000.00 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Question Deadline 08/29/2025 All Project Questions, Bid Questions, and Pre-Bid Equals and Substitution Requests must be submitted fourteen (14) Calendar Days prior to the Bid Due Date All Bid Questions must be emailed to the Procurement Unit listed below. Procurement Unit: Denisa Dede Email: MIL.PROJECTS@ct.gov
Post-Bid
Military
$700,000.00
Public - State/Provincial
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 12, 2025
October 13, 2025
360 Broad St, Hartford, CT
Related To This Project
Hartford, CT
Bid Date: Sep 04 2025
Hartford, CT
Bid Date: Dec 04 2025
Hartford, CT
--
Hartford, CT
--
Hartford, CT
--
Hartford, CT
--
Hartford, CT
--
Hartford, CT
Bid Date: Aug 21 2025
Hartford, CT
Bid Date: Aug 29 2025
Hartford, CT
Bid Date: Aug 20 2025
Hartford, CT
Bid Date: Jul 22 2025
Hartford, CT
--
Hartford, CT
--
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
