Published September 2, 2025 at 8:00 PM

Updated October 8, 2025

Site work and paving for a transportation facility in Rockford, Illinois. Completed plans call for site work for a transportation facility; and for paving for a transportation facility.

Document Notes : Bid Documents Available: Instruction to Bidders, form of proposals, form of agreement, specifications, and wage rate will be available on and may be obtained from BHFX Digital Imaging upon payment of a non-refundable printing fee and registration through BHFX. Hard copies of the documents are required for bidding purposes and only bids from plan holders registered through noted sources will be accepted. All addenda issued for this contract shall also be available through the noted site to registered plan holders as they become available. A Bidder requiring a clarification or interpretation of the contract documents shall make a written request to the Owner or Engineer. Email RFP@flyrfd.com to submit written requests for clarification or interpretation. The Owner or Engineer must receive the written request a minimum of seven (7) calendar days prior to the date of the bid opening The project work consists of the following major items and approximate quantities: Base Bid Cold Milling, Concrete - 21,400 SY, Cold Milling, Bituminous - 1,750 SY, Asphalt Surface Course - 2,950 TON, Asphalt Base Course - 4,500 TON, Pavement Marking - 121,300 SF, Grooving - 19,750 SY, Remove and Replace In-Pavement Light Fixtures - 33 EA, Temporary Displaced Threshold - 1 LS, Reflective Crack Control Treatment - 23,150 SY The Greater Rockford Airport Authority has established a Disadvantaged Business Enterprise (DBE) Program in accordance with regulations of the U.S. Department of Transportation (DOT), 49 CFR Part 26. It is the policy of the Greater Rockford Airport Authority to ensure that DBEs as defined in Part 26, have an equal opportunity to receive and participate in DOT-assisted contracts. The Disadvantaged Business Enterprise (DBE) goal for the project has been established at 10%. Compliance with the requirements of the DBE Program Goals found in Volume #1 of the Specifications is a mandatory part of the bidding process. Contract award will be based in-part upon DBE participation. Each prospective bidder, in evidence of competence, to perform the type of construction or related construction required by the project description, shall furnish to the Chicago Rockford International Airport, Greater Rockford Airport Authority as a part of their prospective proposal, a current, certified or photostatic copy of a "Certificate of Eligibility" issued by the Illinois Department of Transportation in accordance with IDOT's instructions for Prequalification of Contractors. As an alternative to Illinois Department of Transportation pre-qualification, a contractor may submit a statement of experience and financial capability to the Airport along with their bid. Said statement shall provide information regarding the successful completion of a minimum of three projects of similar scope and magnitude within the last two (2) years including project reference who can verify the contractor's role and satisfactory experience performing similar work. The statement will also provide a summary of any outstanding liens or judgments against the contractor or other factors that may interfere with the completion of this work. Finally, the Contractor shall provide a general summary of financial capability. Failure to demonstrate experience or financial capability will be considered cause for disqualification of a bidder. Additional information may be requested after the receipt of bids to further determine that a contemplated awardee is fully qualified to receive the award. Such statements and information shall be furnished immediately upon request. Federal Provisions This project is subject to the following Federal provisions, statutes and regulations by reference: Equal Employment Opportunity - Executive Order 11246 and 41 CFR Part 60: Goals for Minority and Female Participation - Executive Order 11246 and 41 CFR Part 60: Certification of Nonsegregated Facilities - 41 CFR Part 60 Disadvantaged Business Enterprise - 49 CFR Part 26: Davis-Bacon Act, as amended - 29CFR Part 5. Debarment, Suspension, Ineligibility, and Voluntary Exclusion - 49 CFR Part 29. Foreign Trade Restriction - 49 CFR Part 30 Buy American Certificate - Aviation Safety and Capacity Act of 1990: A bid bond, cashier's check, or a certified check made payable to the order of the Chicago Rockford International Airport in the amount of ten percent (10%) of the total bid must be deposited by each bidder with his bid as guarantee that in case the contract is awarded to him, he will within fifteen (15) days thereafter, upon receipt of written notice of award, execute such contract and furnish a satisfactory performance bond. Upon failure to do so, he shall forfeit the deposit as liquidated damages and acceptance of the bid will be contingent upon the fulfillment of this requirement by the bidder. The checks or bid bonds of all, except the three (3) lowest responsible bidders, will be returned within ten (10) days after the bids are opened and read. The remaining checks or bid bonds will be refunded as soon as the contract and bond have been properly executed and approved. A visit to the project site can be arranged by contacting: Chicago Rockford International Airport Matt Zinke - Contracts and Projects Manager 60 Airport Drive, Rockford, IL 61109 Phone No.: 815-703-5331 The successful bidder, as determined by the Owner, will be required to agree that no less than the prevailing rate of wages will be paid to all workmen, laborers, and mechanics performing their work under this contract. All proposals must be made on forms furnished within this set of Contract Documents. The successful bidder will be required to furnish performance bond satisfactory to the owner in the amount of the contract. The owner reserves the right to waive or not to waive any irregularities in the bids and to reject any or all bids and to determine which is the lowest and best bid or combination of bids for the improvements.

Post-Bid

Transportation Terminals

$200,000.00

Public - City

Paving, Site Work

29

14

4

Subscribe For Documents

21 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
538
Active Projects
295
Bidding Soon
3,922
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 15, 2025

September 9, 2025

Project location map

60 Airport Dr, Rockford, IL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.