BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 17, 2025 at 8:00 PM

Updated September 18, 2025

Site work for a water / sewer project in Longbranch, Washington. Completed plans call for site work for a water / sewer project.

The Project includes the following Work: There are two key elements of work on this Project. 1. Schedule A: Installation of approximately 1,175 feet of 8-inch Cured-in-Place-Pipe (CIPP) and 570 feet of 6-inch CIPP in concrete sewer pipe. Three separate areas are designated for CIPP installation. 2. Schedule B: Installation of approximately 3,425 feet of 8-inch Cured-in-Place-Pipe (CIPP) and 575 feet of 6-inch CIPP in concrete sewer pipe. Five separate areas are designated for CIPP installation Taylor Bay Beach Club HOA - Sewer CIPP Improvements For bid questions contact Peter Burgoon, P.E. pburgoon@g-o.com Wenatchee Office: 11 Spokane St, Suite 207, Wenatchee, WA 98801, (509) 853-2460 The Project has an expected duration of 122 days (September 2025 through December 2025). Bidder shall submit all questions about the meaning or intent of the Bidding Documents to Engineer in writing. Contact information and submittal procedures for such questions are as follows: A. Ryan Griggs, rgriggs@g-o.com, Office phone: 509-853-2460 B. Peter Burgoon, PE, pburgoon@g-o.com, Office phone: 509-853-24 Question Deadline 08/07/2025

Award

Water / Sewer

$774,125.00

Public - County

Site Work

17

17

11

4

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
188
Active Projects
92
Bidding Soon
1,262
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 14, 2025

September 1, 2025

Project location map

Multiple Locations, Longbranch, WA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.