Published October 10, 2025 at 8:00 PM

Updated October 14, 2025

Site work and paving for a road / highway in Denver, Colorado. Completed plans call for site work for a road / highway; and for paving for a road / highway.

** As of October 10, 2025, project was awarded to Ulliman Schutte Construction, with no awarded amount available ** Reference Number 0000394272 Metro Water Recovery (Metro) is soliciting Proposals from civil/mechanical contractors interested in providing Job Order Contracting (JOC) construction services for PAR 1463 Farm Road Improvements Project (Project) at Metro's METROGRO Farm located near Deer Trail, Colorado. The purpose of this solicitation is to select one qualified contractor for JOC services. JOC services will include reconstructing road sections totaling approximately 14.6 miles of existing gravel private farm roads located 65 miles east of Denver, Colorado on a private operating dryland Farm. This is not an Invitation to Bid and does not guarantee issuance of any work. Work Package 1 - Hilltop Road and Badger Creek Road, Work Package 2 - Wardel Road, Work Package 3 - Beaver Creek Road , Work Package 4 - Central Ridge Road and Terrace Road Question Deadline 08/18/2025 at 3:00 PM MT Questions are submitted online No, Proposing Contractors may make written requests for information and clarification by contacting the Metro Project Manager via email. Please ensure is included in the subject line of all email communications. No inquiries will be accepted after the date and time indicated in the Schedule of Events. The Metro Project Manager will issue a final response through online on or about the date indicated in the Schedule of Events. Mandatory Pre-Proposal Conference A mandatory pre-proposal virtual conference and virtual site presentation will be held for interested Companies on the date and time indicated in the Schedule of Events. To attend, please contact the Metro Project Manager at least one day prior to the event. A. This Section summarizes the Work covered in detail in the complete Contract Documents. B. Owner: Metro Water Recovery, 6450 York Street, Denver, Colorado 80229, is contracting for Work described in the Contract Documents. 1. Contract Identification: a. Farm Roads Improvements 2. Work Site Location: a. Approximately 8 miles east of Deer Trail, CO on the property owned by Metro Water Recovery. The project site is located in Arapahoe and Elbert Counties. Description of Project: 1. Work for the Farm Roads Improvement project contract generally consists of furnishing, delivering, constructing, installing, and testing approximately 7.4 miles of gravel road, culvert crossing improvements, and new crossing construction. a. The construction of the road improvements work shall include providing and installing all necessary materials, and all other appurtenances to provide an all weather gravel road, and as shown or called for in the Contract Documents. All excavating, backfilling, trenching, erosion control, surface restoration, testing, and site restoration to original conditions shall be performed by the Contractor as part of this Work. The work will include, but is not limited to, the following: 1. Installation of Erosion Control Devices. 2. Clearing and Grubbing of Construction Site for Project Access. 3. Removal and replacement of barbed wire fencing as needed for construction. 4. Construction of Work Package 1 consisting of approximately 3,950 linear feet of gravel road improvements for Hilltop Road and approximately 16,525 linear feet of gravel road improvements for Badger Creek Road. 5. Construction of Work Package 2 consisting of approximately 17,810 linear feet of gravel road improvements for Wardel Road. 6. Construction of Work Package 3 consisting of approximately 19,000 linear feet of gravel road improvements for Beaver Creek Road. 7. Construction of Work Package 4 consisting of approximately 12,170 linear feet of gravel road improvements for Central Ridge Road and approximately 7,720 linear feet of gravel road improvements for Terrace Road. 8. Cleaning and extension of one (1) 24-inch culvert on Hilltop Road. 9. Cleaning and extension of one (1) 24-inch culvert and six (6) 48-inch culverts along Badger Creek Road. 10. Replacement of two (2) 24-inch culverts and installation of one (1) 24-inch corrugated metal culvert along Wardel Road. 11. Installation of three (3) new 36-inch corrugated metal culverts and three (3) new 48-inch corrugated metal culverts along Wardel Road. 12. Removal of existing 144-inch culvert on Wardel Road and construction of 144-inch x 144-inch concrete box culvert with wing walls. 13. Cleaning and extension of three (3) 24-inch culverts along Terrace Road. 14. Site Restoration, as indicated. There are four Work Packages identified for expected scope of work of the Project: 1. Reconstruct elevation, alignment, and drainage along 3.87 miles of gravel road. (WP 1) 2. Reconstruct elevation, alignment, and drainage along 3.38 miles of gravel road. (WP 2) 3. Reconstruct elevation, alignment, and drainage along 3.60 miles of gravel road. (WP 3) 4. Reconstruct elevation, alignment, and drainage along 3.76 miles of gravel road. (WP 4)

Award

Roads / Highways

$7,637,221.00

Public - County

Paving, Site Work

48

13

16

7

Subscribe For Documents

91 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
187
Active Projects
64
Bidding Soon
1,307
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.