BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 23, 2025 at 8:00 PM

Updated October 24, 2025

Site work and paving for a sidewalk / parking lot in Woodstock, Georgia. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

**As of October 23, 2025, the project was awarded to Lagniappe Development Company, with an awarded amount of $397,655.49** Reference Number 0000393504 Question Deadline 08/19/2025 at 12:00 PM ET Questions are submitted online Yes, The City's representative listed in this section will serve as the primary contact for this RFB. Martyn Detz Financial Analyst: Purchasing 12453 Highway 92 Woodstock, Georgia 30188 770-592-6000 ext. 1205 The City of Woodstock, Georgia, herein referred to as the City, is accepting bids from qualified contractors for the purpose of improving pedestrian access and safety by constructing new sidewalk infrastructure along Dupree Road, hereinafter referred to as the "Project". This project will be a collaborative one with Cherokee County and will create a safe and accessible connection by way of installation of sidewalk/ trail segments along Dupree Road from Market Street to the eastern edge of the I-575 bridge. The City of Woodstock has received Community Development Block Grant (CDBG) funds from Cherokee Country as a pass through the U.S Department of Housing and Urban Development (HUD) from the implementation of public facility improvements by installing sidewalks/ trailways in an LMI area for safer, easier access to vital destinations for this project. Bid Intent Not Available Participation Requirements - Minority Business Participation - Women-Owned Business Participation General Requirements - Bidder Prequalification/Preregistration Required - Federally Funded - Insurance Required - Prevailing Wage Required Bonding Requirements - Bid Bond 5 % - Performance Bond 100 % - Payment Bond 100 % The City of Woodstock, Georgia reserves the right to reject any and all responses resulting from this RFB. Late responses will not be accepted. If company response is sent or routed to City offices, the submission requirement has not been met and any such response will not be evaluated and will be disqualified from consideration.

Award

Sidewalks / Parking Lot

$397,655.00

Public - City

Paving, Site Work

43

5

4

7

Subscribe For Documents

70 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
58
Active Projects
2
Bidding Soon
1,220
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 3, 2025

October 13, 2025

Project location map

Dupree Rd, Woodstock, GA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.