Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published October 8, 2025 at 8:00 PM
Updated October 10, 2025
Site work and paving for a mixed-use development in Stillwater, Oklahoma. Working plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.
The Board of County Commissioners, or their appointed representative, will evaluate all bids, and reserves the right to reject any or all bids, and reserves the right to waive any of the listed specifications. The Board of County Commissioners reserves the right to accept the bid determined to best serve the needs of Payne County. 1. Site Preparation and Pulver-Mixing Mobilization of necessary equipment and crew. o Pulverize and mix existing asphalt and subgrade to an 8-inch depth using specialized reclaiming equipment. o Removal and offsite disposal of 6 inches of pulverized material to achieve target base grade if need be. o Grading and shaping the remaining base material to ensure proper compaction and drainage. 2. Subgrade Stabilization Application of Portland Cement at a rate of 3.5% across the full treated area to achieve 8" ofsubgrade, after compaction. o Thorough blending and moisture control for effective stabilization. o Compaction ofthe stabilized base to achieve 95% compaction and support for the asphalt layer. Project Specifications Subject: Bid Proposals for Asphalt Driveway Reconstruction - Payne County Facility o Driveway Dimensions: 600 feet long x 25 feet wide o Total Area: 15,000 square feet o Pulver-Mix Depth: 8 inches Concrete Stabilizer: 3.5% of treated area County will collect bill of lading tickets from every truckload. Said ticket tonnage will be used as basis for calculation of total tonnage used for the project. Payne County hereby notifies all bidders that it will affirmatively ensure that in any contract entered into pursuant to this advertisement, minority business enterprises will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, sex or national origin in consideration for an award.
Final Planning
Roads / Highways
$30,000.00
Public - County
Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 8, 2025
April 8, 2026
To Be Determined, Stillwater, OK
Related To This Project
Stillwater, OK
Bid Date: Sep 16 2025
Stillwater, OK
Bid Date: Aug 29 2025
Stillwater, OK
Bid Date: Aug 31 2021
Stillwater, OK
Bid Date: Sep 10 2025
Stillwater, OK
Bid Date: Aug 26 2021
Stillwater, OK
Bid Date: Sep 19 2025
Stillwater, OK
Bid Date: Aug 08 2025
Stillwater, OK
Bid Date: Aug 13 2025
Stillwater, OK
Bid Date: Oct 15 2025
Stillwater, OK
Bid Date: Jul 28 2025
Stillwater, OK
Bid Date: Aug 27 2025
Stillwater, OK
Bid Date: Aug 14 2025
Stillwater, OK
Bid Date: Jul 28 2025
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
