BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 14, 2025 at 8:00 PM

Updated August 15, 2025

Remodeling of a stadium in Stillwater, Oklahoma. Completed plans call for the remodel of a stadium.

OSU Boone Pickens Stadium West Endzone Bench Question Deadline 07/24/2025 Please contact Jeff Blose (jhblose@flintco.com) or Kyle Rhine (kyle.rhine@flintco.com) with Flintco at (918) 710-3277 with any questions about bid procedures or documents The scope of work for ALL bid packages shall include, but is not necessarily limited to, the following general items: Project Coordination: 1.) Contractor is to furnish manpower, materials, and equipment necessary, as required by the project schedule, including interim milestone dates, and to furnish additional crews, equipment, etc. and/or overtime required to maintain the schedule if Contractor falls behind due to their own fault or due to inclement weather. 2.) Contractor is responsible for field engineering, layout and field layout from benchmarks and base building control furnished by the Construction Manager. The Construction Manager shall provide one horizontal and one vertical control point and transfer of this point is the responsibility of the contractor. Rough-In requirements are to be dimensioned off of column lines as shown on the contract documents. 3.) Contractor shall furnish hoisting, material transport, and all material handling for the scope of this bid package. 4.) Contractor shall furnish pumping and dewatering as required for the scope of this bid package. Any performed must be done so as not to hinder any other tradesí work. 5.) Contractor will perform any saw cutting, patching, and removal of debris as required for the scope of this bid package. The Construction Manager must approve the quality of any cutting and patching work. 6.) Contractor shall furnish drinking water for its employees and its subcontractorsí employees for the scope of this bid package. 7.) Contractor shall include all remobilization operations required to complete the scope of this bid package. 8.) Contractor shall include temporary power for the scope of their work until building temporary power is provided. 9.) Contractor shall coordinate all material deliveries with the Construction Manager and shall have a representative on site to receive all deliveries of materials under the scope of work of this bid package. 10.) Contractor shall clean up his work in such a manner as to maintain safe working conditions on the project

Post-Bid

Arenas / Stadiums

$250,000.00

Public - State/Provincial

Remodeling

14

31

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
144
Active Projects
74
Bidding Soon
1,034
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 14, 2025

September 15, 2025

Project location map

700 W Hall of Fame Ave, Stillwater, OK


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.