Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published October 15, 2025 at 8:00 PM
Updated October 16, 2025
Site work and paving for a road / highway in Wylie, Texas. Completed plans call for site work for a road / highway; and for paving for a road / highway.
For construction of the Paving Repair Improvements of Old Soul Way, Scope:- Old Soul Way was constructed with Inspiration Phase 5B which is located in the City of Wylie, ETJ, Collin County, Texas. Inspiration Phase 5B consists of 170 Residential Lots and 7 Non-Residential. Old Soul Way Paving Repair Improvements consist of approximately 1,400 SY of 7" reinforced concrete paving and approximately 140 SY of 6" reinforced concrete driveways. The deadline to ask questions is 8/14/2025 12:00 AM CST Bid security in the form of bid bond or cashiers check payable to Collin County Water Control and Improvement District No. 3 in an amount not less than five percent (5%) of the Bid submitted, must accompany each Bid. Collin County Water Control and Improvement District No. 3 reserves the right to reject any and all bids. a) Contractor shall access the site through Existing Old Soul Way. The Contractor shall coordinate access and notifications to existing residents with the General Manager prior to construction. Any damage caused by the contractor shall be repaired at the contractor's expense. b) Existing Old Soul Way utility infrastructure, landscape, and structures shall remain in place or be adjusted to grade if impacted by pavement repair. Contractor shall locate and verify crossing utilities and structures prior to paving demolition. Contractor shall immediately notify the engineer of any discrepancies from construction plans and available record drawings. c) Any Earthwork or concrete spoil material shall be hauled off and properly disposed of by contractor. d) Access to residents on Old Soul Way must be always maintained. At least one lane along Old Soul Way shall remain open to facilitate traffic flow during the construction period. e) Erosion Control: The Erosion Control Plan, NOI, SWPPP and inspections are the responsibility of the Owner. Contractor will be responsible to provide/maintain erosion control measures to prevent sediment and construction materials from entering the existing storm sewer system and adjacent properties. Any material entering these areas will be removed at the Contractor's expense. f) Coordination with Testing Lab: Refer to Special Conditions. Contractor is responsible for scheduling, coordinating, and plotting all tests. Contractor is also responsible for ensuring that all tests and retests have passed. g) It is the Contractor's obligation to observe safety rules for traffic and OSHA requirements on all construction phases of this project. The Contractor shall be responsible for meeting and complying with all provisions of the various regulations. h) Water for all construction purposes shall be supplied by Wylie Northeast SUD at the contractor's expense. Contractor shall coordinate with the General Manager and water provider to obtain a water meter for construction. i) Existing fire hydrants are located along Old Soul Way j) Coordinate with General Manager prior to any paving activities on adjacent properties. k) The final geotechnical report prepared by UES is included for reference. l) Inspections will be provided by Collin County Water Control and Improvement District No. 3 (LJA Engineering, Inc.) for paving repairs. m) Upon final completion of all construction, the contractor is responsible for properly cleaning up and disposing of any construction waste or excess material and returning parkway grades to finished condition. n) Pay applications are due to the District Engineer by the 25th of every month covering work completed as of the date of the application.
Award
Roads / Highways
$215,416.00
Public - County
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 21, 2025
September 1, 2025
Old Soul Way, Wylie, TX
Related To This Project
Wylie, TX
--
Wylie, TX
--
Wylie, TX
--
Wylie, TX
Bid Date: Aug 27 2025
Wylie, TX
--
Wylie, TX
--
Wylie, TX
Bid Date: Sep 11 2025
Wylie, TX
Bid Date: Sep 12 2025
Wylie, TX
Bid Date: Aug 19 2025
Wylie, TX
Bid Date: Aug 18 2025
Wylie, TX
Bid Date: Aug 07 2025
Wylie, TX
Bid Date: Sep 04 2025
Wylie, TX
Bid Date: Aug 07 2025
Wylie, TX
Bid Date: Aug 25 2025
Wylie, TX
Bid Date: Aug 14 2025
See the Projects and Companies Shaping 2026 Before Anyone Else
Start the New Year with a clearer view of the construction market. Unlock early access to commercial project data that keeps your pipeline full and your competitors behind. Sign up today for the project and contact data that others won't discover until its too late.
