BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 11, 2025 at 8:00 PM

Updated October 15, 2025

Site work and renovation of a civil project in Wylie, Texas. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.

Demo and Removals Furnish and Install Clarifier Modifications to the existing Storage Basin Modifications to Chlorine Contact Unit Furnish and Install Chlorine Contact Unit Furnish and Install Backwash Pumps Furnish and Install RAS/WAS Pump Station Modifications to Sludge Storage Unit Modifications to Chlorine and Tool Room Seeding and Sodding Yard Piping - Furnish and Install as shown on Drawings Note: Influent Line & Associated Modifications have been procured under the separate contract. Provide Trench Safety Plan Trench Safety Per OSHA Requirements Installation of CMAR Furnished Generator and ATS Electrical Demo Electrical work as shown on drawings Instrumentation as show on drawings Controls as described in the drawing and specifications Coordination with other Contracts and Packages Job Site cleanup and proper disposal for work under this subcontract is to be carried out daily Maintenance of Record Drawings for all work under this subcontract, provide information to CMAR each month with application for payment. Prior to the award of contract to an out-of-state PROPOSER, the PROPOSER shall be licensed to do business in the State of Texas. For licensing procedures, contract the Texas Secretary of State Offices (Telephone Number 1-512-463-5555 or 1-900-263-0060). Question Deadline 08/07/2025 - All questions about the meaning or intent of the Contract Documents shall be posted to Online at least 7 calendar days prior to the scheduled proposal opening. As Time is of the essence, any delay to the completion date of the project that is deemed the responsibility of the PROPOSER, the following liquidated damages shall be assessed against the PROPOSER: $500 per day beyond Substantial Completion $500 per day beyond Final Completion Payment and Performance Bond will be required for this Project and shall be included in the Proposal Price. Reference the attached Subcontractor Agreement in Appendix A for the bonding requirements. In the case of ambiguity or lack of clearness in stating prices in the Proposal, the OWNER, CMAR, and ENGINEER reserves the right to adopt the most advantageous construction thereof to the OWNER or to reject the Proposal.

Bid Results

Water / Sewer

$3,800,000.00

Public - City

Renovation, Site Work

62

31

7

6

Subscribe For Documents

76 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
395
Active Projects
182
Bidding Soon
4,091
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 14, 2025

September 15, 2025

Project location map

1007 Riva Ridge, Wylie, TX


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.