BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 12, 2025 at 8:00 PM

Updated October 3, 2025

Site work for a water / sewer project in Wylie, Texas. Completed plans call for site work for a water / sewer project.

As of September 12, 2025, this project has not yet been awarded. A timeline for the award has not yet been established. Set Point Control Implementation Phase V - Package A3 project includes the improvements to 4 delivery site locations throughout Collin County. The project sites include Farmersville, Lucas No. 3, Milligan, and Princeton No. 1. Reference sheet G00-03 in the construction plans for a location map. Farmersville, Lucas No. 3, and Princeton No. 1 site improvements consist of the construction of a new meter vault and yard piping. The construction will include a control valve, electromagnetic meter, isolation valves, castin-place vault, precast concrete building, site and grading improvements, yard piping, and demolition, modification, or abandonment of existing vaults. The Milligan improvements consist primarily of replacing equipment inside of the existing vault. Construction at this site includes a control valve, electromagnetic meter, isolation valves, electrical and instrumentation improvements, and a new electrical building. The North Texas Municipal Water District (NTMWD) is soliciting bids from qualified vendors for improvements to 4 delivery site locations throughout Collin County. The project sites include Farmersville, Lucas No. 3, Milligan, and Princeton No. 1. Reference sheet G00-03 in the construction plans for a location map. Farmersville, Lucas No. 3, and Princeton No. 1 site improvements consist of the construction of a new meter vault and yard piping. The construction will include a control valve, electromagnetic meter, isolation valves, cast-in-place vault, precast concrete building, site and grading improvements, yard piping, and demolition, modification, or abandonment of existing vaults. The Milligan improvements consist primarily of replacing equipment inside of the existing vault. Construction at this site includes a control valve, electromagnetic meter, isolation valves, electrical and instrumentation improvements, and a new electrical building. The OPCC range for this project is $10 - 13.5M. Intent to Bid Due Date: Aug 13th 2025, 2:00 PM CDT Questions Due Date: Aug 1st 2025, 5:00 PM CDT *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Bid Results

Water / Sewer

$13,066,900.00

Public - City

Site Work

145

24

4

8

Subscribe For Documents

52 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
395
Active Projects
182
Bidding Soon
4,091
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 13, 2025

September 12, 2025

Project location map

Multiple Locations, Wylie, TX


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.