Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published September 25, 2025 at 8:00 PM
Updated September 26, 2025
Renovation of a swimming pool in Henderson, Nevada. Working plans call for the renovation of a 7,400-square-foot swimming pool.
“The owner has determined a prequalified list of construction managers. " Pre-construction services shall include constructability reviews, construction cost estimates, market availability / constructability advice, project analysis and feedback regarding materials, methods, systems, schedule, labor and other conditions affecting construction and subcontractor selection for development and construction of the Project. The selected CMAR shall provide support in evaluating, confirming feasibility, planning and managing specialized subcontractor work such as pool plaster replacement, pool decking installation and slide rehabilitation. Add alternates may be considered, pending scope and budget availability. The anticipated scope of construction includes comprehensive renovations to the Whitney Ranch Activity Pool facility. Work will include complete removal and replacement of approximately 7,400 square feet of white quartz-enhanced pool plaster (33% quartz aggregate), removal and replacement of the pool's cleanouts, floor drains, light niches, and underwater lighting fixtures, and installation of new waterline tile and tile-inlay depth markers in compliance with Southern Nevada Health District standards. The existing concrete pool deck--approximately 36,000 square feet--will be resurfaced using a thermoplastic deck coating system, with Pool Surface Coatings' AquaFlex specified as the Basis of Design. The project also includes the installation of a new 30' x 100' standing seam metal shade structure over a portion of the pool deck, complete with new plumbing and electrical service (including hose bibs, GFCI receptacles, and low-voltage conduit for future Wi-Fi connectivity). Additional improvements include the rehabilitation of an existing water slide and associated stairs, replacement of all deck drains with JOSAM PRO-PLUS 100C series drains, replacement of autofill and install new sealant at expansion joints, installation of a new play structure provided by the City, and various appurtenances to ensure code compliance, accessibility, and long-term durability. Question Cut Off Date: 9/2/2025 12:00:00 PM (PT) State of Nevada Prevailing Wage Rates will apply, as the City's construction estimate is between $1,000,000 and $1,200,000 (based on available funding). *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Final Planning
Swimming Pools
$1,200,000.00
Public - City
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
7
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 10, 2025
September 26, 2025
1575 Galleria Dr, Henderson, NV
Related To This Project
Henderson, NV
Bid Date: Sep 04 2025
Henderson, NV
Bid Date: Aug 25 2025
Henderson, NV
Bid Date: Aug 28 2025
Henderson, NV
Bid Date: Jul 01 2020
Henderson, NV
Bid Date: Sep 10 2025
Henderson, NV
Bid Date: Sep 29 2025
Henderson, NV
Bid Date: Sep 02 2025
Henderson, NV
--
Henderson, NV
--
Henderson, NV
Bid Date: Sep 10 2025
Henderson, NV
Bid Date: Aug 18 2025
Henderson, NV
Bid Date: May 21 2020
Henderson, NV
Bid Date: Aug 05 2025
Henderson, NV
--
Henderson, NV
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
