BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 18, 2025 at 8:00 PM

Updated August 19, 2025

Demolition, site work, renovation and addition to a fire / police facility in Livingston, Texas. Conceptual plans call for the addition of a 11,591-square-foot fire / police facility; for the demolition of a fire / police facility; and for the renovation of a fire / police facility.

As of August 18,2025, this project has been cancelled. There are no plans to re-bid at this time. The Alabama-Coushatta Tribe of Texas is accepting bids on providing all material and labor to construct a Bay Expansion and Room Additions to Fire Station #2. The bid shall not include any State of Texas sales tax. The Tribe is exempt from such tax and shall provide a letter to that effect. The bid shall be submitted on the bidder s letterhead and shall be signed by the owner, partner or officer of the corporation. The signature shall be accompanied by the signee s appropriate title. The bid shall be valid for 30 days after the bid closing date. By submitting a signed bid, the signee acknowledges his bid to be a true and accurate bid based on the project specifications and site examination. The bid form shall clearly identify the project with the bid amount and construction duration in days . Estimated cost: $360,000-$600,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The owner requires that all work under this contract be completed as quickly as possible and consideration will be given to time of completion when reviewing the submitted bids. TIME FOR COMPLETION SHALL BE NOTED ON THE BID LETTER. The contractor shall provide complete construction services to construct New Bay Expansion and Room Addition Per construction drawings and specifications. The contractor shall always keep the job site clean of trash and loose debris with daily clean-up, and upon completion, the site shall be cleaned of all construction materials and trash All questions shall be addressed to the owner's representative who will provide all directions to the contractor. TECHNICAL SPECIFICATIONS NOTE: See Attached Drawings and Specifications.

Project Abandoned

Fire / Police

$600,000.00

Public - Federal

Addition, Demolition, Renovation, Site Work

5

4

2

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
364
Active Projects
219
Bidding Soon
3,352
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 21, 2025

September 22, 2025

Project location map

13982 US-190, Livingston, TX

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.