Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 3, 2025 at 8:00 PM

Updated September 4, 2025

Site work for a bridge / tunnel in Squamish, British Columbia. Completed plans call for site work for a bridge / tunnel.

BC Parks is inviting qualified contractors to submit bids for the replacement of a temporary pedestrian bridge on the Rubble Creek Trail in Garibaldi Park, approximately 2.0 km from the trailhead. The replacement structure will be a custom 14 m long prefabricated steel girder bridge, delivered and installed by helicopter to minimize trail impacts. The successful proponent will be responsible for removing the existing bridge and delivering it to the BC Parks Alice Lake office. Documents can be obtained from www.bcbid.gov.bc.ca

Award

Bridges / Tunnels

$136,883.00

Public - State/Provincial

Site Work

Our team is requesting plans for this project.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
223
Active Projects
81
Bidding Soon
1,718
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed