BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 3, 2025 at 8:00 PM

Updated September 4, 2025

Site work for a civil project in Chilliwack, British Columbia. Completed plans call for site work for a bridge / tunnel; road / highway; and water / sewer project.

The purpose of this Major Works Construction Contract is to repair sections on the Kookipi, Kookipi Branch 3 (6700), and Kookipi Branch 7 (West 400) FSRs that were damaged in the November 2021 storm event. Road reconstruction will include the installation of four major crossing with heavy walled steel pipes at 2.3km, 2.865km, 4.3km, and 4.7km on the Kookipi Branch 3 FSR. Other works on the three FSRs will involve minor culvert installations, French drain installation, rock buttressing on fill and cutslopes, road lifting/realignment and surfacing, quarry development, riprap placement in crossing locations, pullback of over steepened FSR sections, and clearing of material from raveling sections on the FSRs. Danger tree falling within repair site areas will also be required. Much of the works will be done per engineered plans and drawings completed by Stonecroft Engineering Ltd. Documents can be obtained from www.bcbid.gov.bc.ca OTHER BIDDER: Arda Creek Contracting Ltd $877,825.53 Award subject to final approval is Karin Jane Ely (Lillooet BC) $709,200

Award

Roads / Highways

$709,200.00

Public - State/Provincial

Site Work

159

9

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
209
Active Projects
83
Bidding Soon
2,340
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 2, 2025

October 20, 2025

Project location map

Kookipi Rd, Chilliwack, BC

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.