BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 4, 2025 at 8:00 PM

Updated August 5, 2025

Demolition, site work, paving and new construction of a mixed-use development in East Saint Louis, Illinois. Conceptual plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

This project requires 19% DBE participation, or if the contract goal is not met, documented evidence of good faith efforts. The Complexity Factor for this project is 0. The Consultant who is selected for this project and all Subconsultants the Prime Consultant will be using are scheduled to attend an initial meeting on October 21, 2025,s at 9:00 AM at the Region Five/District Eight Office in Collinsville. Phase I engineering services are required to prepare a Project Report for the replacement of the Martin Luther King (MLK) Bridge. This project will entail the replacement of the structure carrying Martin Luther King Dr over the Mississippi River and constructing a new structure and associated roadway work. Phase I engineering services required for this project are anticipated to include the preparation of the Project Report, environmental review, Bridge Condition Report, hydraulic report, Location Drainage Study, Subsurface Utility Engineering (SUE), public involvement using Context Sensitive Solutions, traffic management plan (TMP), route surveys, preliminary structural design and all other work necessary to complete Phase I and obtain Design Approval. Type, size and location (TSL) drawings will not be included in this contract. Questions concerning this Bulletin should be directed to: E-mail: DOT.ConsultantServices@illinois.gov Or mailing address: Bureau of Design and Environment 2300 South Dirksen Parkway Attn: Consultant Unit Room 330 Springfield, IL 62764 The completion date for this contract will be 36 months after authorization to proceed. The Prime firm must be prequalified in the Location Design Studies (New Construction/Major Reconstruction) category to be considered for this project. Statements of Interest, including resumes of only the key people noted above, must be submitted electronically to the Central Bureau of Design and Environment through the Engineering Prequalification and Agreement System (EPAS). The method of contractor selection has not been determined at this time. ILDOT - 45 - RFQ Engineering - Martin Luther King Dr (FAP 799) over Mississippi River (MLK Bridge) in East St. Louis, IL

Conceptual

Bridges / Tunnels

$400,000,000.00

Public - State/Provincial

Demolition, New Construction, Paving, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
200
Active Projects
96
Bidding Soon
1,319
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 21, 2026

Project location map

Martin Luther King Dr, East Saint Louis, IL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.