Site work and paving for a transportation facility in Deridder, Louisiana. Completed plans call for site work for a transportation facility; and for paving for a transportation facility.
Beauregard Regional Airport Runway Rehabilitation This project encompasses rehabilitation of Runways 14-32 and 18-36 by way of Thermoplastic Coal TarEmulsion Seal Coat application. The project will occur in three phases, the first of which will require closure of Runway 14-32 for its rehabilitation outside the extents of the Runway 18-36 safety area. The second project phase will involve closure of Runway 18-36 for its rehabilitation outside the extents of the Runway 14-32 safety area. The third and final phase will involve closure of both runwaysfor completion of pavement rehabilitation work within the intersection of both runways where both runway safety areas overlap; work during the third project phase will be restricted to occur during nighttime working hours to minimize impacts to airfield operations to the greatest extent possible. Prior to seal coat application within eachproject phase, the respective runway pavements will be cleaned, and all existing markings will be removed. Following marking removal, all existing cracks with widths equal to and greater than 1/4 inch will be sealed. After crack repairs have been made, the seal coat will be applied and will be given adequate time to cure per manufacturer recommendations. Once the thermoplastic material has cured, permanent pavement markings will be installed. An acceptable bid bond, cashiers check or certified check payable to the Beauregard Parish Airport District No. 1, in an amount equal to five percent (5%) of the bid price, shall be submitted with each bid. The successful Bidder will be required to furnish and pay for satisfactory performance and payment bonds. Bidders are advised that Performance, Payment, and Maintenance Bond, each in the amount of 100 percent (100%) of the contract price, will be required. The Beauregard Parish Airport District No. 1 reserves the right to reject any or all Bids for just cause and reserves the right to waive any and all informalities. Goals for minority participation for each trade: 17.8% Goals for female participation in each trade: 6.9% The Disadvantaged Business Enterprise (DBE) goal is 6.83% of the dollar value of this contract. Phase 1 Duration: 15 days Estimated Start Date: October 2025 Estimated Completion Date: October 2025 Tasks Mobilization. Establish Staging and Stockpile Area. Establish Contractor's Access Route. Install/maintain low profile barricades and runway closure markers for closure of Runway 14-32. Perform pavement marking removal on Runway 14-32 outside Runway 18-36 safety area. Perform crack sealing on Runway 14-32 outside Runway 18-36 safety area. Install Thermoplastic Coal Tar Emulsion Sand Slurry Seal Coat on Runway 14-32 outside Runway 18-36 safety area. Install permanent markings on Runway 14-32. Reopen Runway 14-32. Phase 2 Duration: 15 days Estimated Start Date: October 2025 Estimated Completion Date: November 2025 Tasks Install/maintain low profile barricades and runway closure markers for closure of Runway 18-36. Perform pavement marking removal on Runway 18-36 outside Runway 14-32 safety area. Perform crack sealing on Runway 18-36 outside Runway 14-32 safety area. Install Thermoplastic Coal Tar Emulsion Sand Slurry Seal Coat on Runway 18-36 outside Runway 14-32 safety area. Install permanent markings on Runway 18-36. Phase 3 Duration: 10 days Estimated Start Date: November 2025 Estimated Completion Date: November 2025 Tasks Install/maintain low profile barricades and runway closure markers for nighttime closure of Runways 14-32 and 18-36. Perform pavement marking removal on Runways 14-32 and 18-36 within Phase 3 project area. Perform crack sealing on Runways 14-32 and 18-36 within Phase 3 project area. Install Thermoplastic Coal Tar Emulsion Sand Slurry Seal Coat on Runways 14-32 and 18-36 within Phase 3 project area. Install permanent markings on Runways 14-32 and 18-36 within Phase 3 project area. Reopen Runways 14-32 and 18-36 Question Deadline 08/22/2025 Please submit questions for the project 72 hours prior to bid opening through online in the Q&A portal.
Bid Results
Transportation Terminals
$774,106.00
Public - County
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 27, 2025
October 1, 2025
Multiple Locations, Deridder, LA
Related To This Project
Deridder, LA
--
Deridder, LA
Bid Date: Sep 08 2025
Deridder, LA
Bid Date: May 08 2019
Deridder, LA
Bid Date: Oct 29 2025
Deridder, LA
Bid Date: Nov 04 2025
Deridder, LA
Bid Date: Jan 22 2026
Deridder, LA
Bid Date: Nov 24 2025
Deridder, LA
Bid Date: Jan 06 2026
Deridder, LA
Bid Date: May 27 2025
Deridder, LA
--
Deridder, LA
--
Deridder, LA
Bid Date: Dec 10 2020
Deridder, LA
Bid Date: Apr 10 2025
Deridder, LA
Bid Date: Apr 08 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.