Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published August 27, 2025 at 8:00 PM
Updated August 28, 2025
Site work and new construction of a mixed-use development in Elgin, Texas. Completed plans call for the construction of a 22,000-square-foot, two-story above grade educational facility; for site work for a educational facility; and playground / park / athletic field.
Bartlett Cocke is the CMAR on The New Middle School 2 for Elgin ISD. This project will be a ground-up construction of a state-of-the-art facility designed to serve up to 1,200 students. The files provided are the 100% CD documents package that will be Bid for GMP02. The GMP01 scope items already bid and consisted of building concrete, site concrete, structural steel fabrication & erection, earthwork, erosion control, and site utilities. The rest of the scope is going to be GMP02. The site is located at 2005 FM 1704, approximately 3 miles from Highway 290. Formerly agricultural land, the property features meadows, wooded areas, stock ponds, and drainage lines The new facility will consist of multiple two-story steel framed classroom wings, each with a footprint of approximately 22,000 square feet. There will also be a separate masonry Field House that will be located near the future track and field, and a similar building that will house the OSSF Equipment. The project is expected to start on 8/19/2025 and finish on 6/16/2027. The project is tax exempt. This is a wage rates project. There will not be a site visit. Question Deadline 08/11/2025 at 2:00 PM CT Please have all RFI
Post-Bid
Educational
$4,000,000.00
Public - City
New Construction, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 26, 2025
September 25, 2025
2005 Farm to Market Rd 1704, Elgin, TX
Related To This Project
Elgin, TX
Bid Date: Sep 09 2025
Elgin, TX
--
Elgin, TX
Bid Date: Oct 30 2025
Elgin, TX
Bid Date: Oct 30 2025
Elgin, TX
Bid Date: Oct 08 2025
Elgin, TX
Bid Date: Nov 11 2025
Elgin, TX
Bid Date: Aug 13 2025
Elgin, TX
Bid Date: Aug 07 2025
Elgin, TX
--
Elgin, TX
Bid Date: Jul 08 2025
Elgin, TX
Bid Date: Oct 14 2025
Elgin, TX
Bid Date: Sep 09 2025
Elgin, TX
Bid Date: Jul 09 2025
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
