BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 27, 2025 at 8:00 PM

Updated August 28, 2025

Site work and new construction of a mixed-use development in Elgin, Texas. Completed plans call for the construction of a 22,000-square-foot, two-story above grade educational facility; for site work for a educational facility; and playground / park / athletic field.

Bartlett Cocke is the CMAR on The New Middle School 2 for Elgin ISD. This project will be a ground-up construction of a state-of-the-art facility designed to serve up to 1,200 students. The files provided are the 100% CD documents package that will be Bid for GMP02. The GMP01 scope items already bid and consisted of building concrete, site concrete, structural steel fabrication & erection, earthwork, erosion control, and site utilities. The rest of the scope is going to be GMP02. The site is located at 2005 FM 1704, approximately 3 miles from Highway 290. Formerly agricultural land, the property features meadows, wooded areas, stock ponds, and drainage lines The new facility will consist of multiple two-story steel framed classroom wings, each with a footprint of approximately 22,000 square feet. There will also be a separate masonry Field House that will be located near the future track and field, and a similar building that will house the OSSF Equipment. The project is expected to start on 8/19/2025 and finish on 6/16/2027. The project is tax exempt. This is a wage rates project. There will not be a site visit. Question Deadline 08/11/2025 at 2:00 PM CT Please have all RFI

Post-Bid

Educational

$4,000,000.00

Public - City

New Construction, Site Work

481

32

336

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
339
Active Projects
116
Bidding Soon
2,941
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 26, 2025

September 25, 2025

Project location map

2005 Farm to Market Rd 1704, Elgin, TX


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.