Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published September 15, 2025 at 8:00 PM
Updated December 10, 2025
Renovation of a mixed-use development in Westport, Connecticut. Completed plans call for the renovation of a theater / auditorium.
Staples HS Construction Services - Auditorium Modifications Question Deadline 08/22/2025 at 1:00 PM ET All questions regarding this RFP must be submitted in writing to the designated contact within the timeframes set forth in the RFP Schedule. Copies of questions and responses will be issued to all respondents as an Addendum to this RFP as set forth in the RFP Schedule. Designated contact: John Koplas, Sr. Project Manager at Colliers Project Leaders, (john.koplas@collierseng.com). Answers Issued By Addendum: Thursday, August 28, 2025 by 2:00 p.m The following services are required of the contractor: o The selected General Contractor shall provide all necessary materials and labor required to address: 1. Requirements of the contractual documents AIA-A101-2017, modified; AIAA101-2017ExhibitA, modified; and AIA-A201-2017, modified, 2. The modifications to the existing rigging system and provision of new rigging system, as reflected within the drawing package from Theater Design and Specification section 116010, 3. The installation of the new Loading Gallery, as reflected within the drawing package from McLaren Engineering Group, 4. Relocation of the existing water piping (to be hung from the new Loading Gallery), including insulation; location to be confirmed in field and to avoid conflict with any new work, 5. The demolition of the existing and installation of the new lighting system as reflected within the drawing packages from Theater Design and CES, and Specification section 260953, 6. The modifications to the existing audio and visual system and associated components as reflected within the drawing packages from Theater Design and D'Agostino & Associates, and Specification section 274100, and 7. All associated Permit fees. o Note that the project will be subject to Prevailing Wage Rates.
Post-Bid
Theaters / Auditoriums
$135,000.00
Public - City
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 11, 2025
October 13, 2025
70 North Ave, Westport, CT
Related To This Project
Westport, CT
Bid Date: Sep 22 2025
Westport, CT
Bid Date: Aug 22 2025
Westport, CT
Bid Date: Oct 03 2025
Westport, CT
--
Westport, CT
Bid Date: Oct 03 2025
Westport, CT
Bid Date: Oct 08 2025
Westport, CT
Bid Date: Oct 15 2025
Westport, CT
Bid Date: Oct 17 2025
Westport, CT
Bid Date: Aug 14 2025
Westport, CT
Bid Date: Aug 14 2025
Westport, CT
Bid Date: Jul 22 2025
Westport, CT
Bid Date: Jul 08 2025
Westport, CT
Bid Date: Jun 04 2020
Westport, CT
Bid Date: May 28 2025
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
