Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 15, 2025 at 8:00 PM

Updated December 10, 2025

Renovation of a mixed-use development in Westport, Connecticut. Completed plans call for the renovation of a theater / auditorium.

Staples HS Construction Services - Auditorium Modifications Question Deadline 08/22/2025 at 1:00 PM ET All questions regarding this RFP must be submitted in writing to the designated contact within the timeframes set forth in the RFP Schedule. Copies of questions and responses will be issued to all respondents as an Addendum to this RFP as set forth in the RFP Schedule. Designated contact: John Koplas, Sr. Project Manager at Colliers Project Leaders, (john.koplas@collierseng.com). Answers Issued By Addendum: Thursday, August 28, 2025 by 2:00 p.m The following services are required of the contractor: o The selected General Contractor shall provide all necessary materials and labor required to address: 1. Requirements of the contractual documents AIA-A101-2017, modified; AIAA101-2017ExhibitA, modified; and AIA-A201-2017, modified, 2. The modifications to the existing rigging system and provision of new rigging system, as reflected within the drawing package from Theater Design and Specification section 116010, 3. The installation of the new Loading Gallery, as reflected within the drawing package from McLaren Engineering Group, 4. Relocation of the existing water piping (to be hung from the new Loading Gallery), including insulation; location to be confirmed in field and to avoid conflict with any new work, 5. The demolition of the existing and installation of the new lighting system as reflected within the drawing packages from Theater Design and CES, and Specification section 260953, 6. The modifications to the existing audio and visual system and associated components as reflected within the drawing packages from Theater Design and D'Agostino & Associates, and Specification section 274100, and 7. All associated Permit fees. o Note that the project will be subject to Prevailing Wage Rates.

Post-Bid

Theaters / Auditoriums

$135,000.00

Public - City

Renovation

40

8

13

2

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
1,112
Active Projects
463
Bidding Soon
6,762
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 11, 2025

October 13, 2025

Project location map

70 North Ave, Westport, CT


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed