Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published October 23, 2025 at 8:00 PM
Updated October 24, 2025
Site work, paving and new construction of a mixed-use development in Westport, Connecticut. Completed plans call for the construction of a industrial development; for site work for a industrial development; sidewalk / parking lot; for paving for a sidewalk / parking lot; 4,450-square-foot, one-story above grade pre-engineered storage facility; and pre-engineered storage facility.
Cold Storage Building Location- Sherwood Island State Park Construction of a one-story structure to provide cold storage for DEEP park maintenance equipment. Work includes sitework with electrical power relocation and new service, concrete and asphalt paving, concrete footings, foundation wall and slab-on-grade, CMU knee walls with pre-cast caps, a five-bay pre-engineered (manufactured) building system, six 12' x 12' overhead doors, and basic lighting, power, and ventilation systems. The building will be unheated. Prevailing wages are required. General Conditions Earthwork Utilities Concrete Work Asphalt Paving Pre-Engineered Building System Electrical Work Mechanical Work Liquidated Damages: $500 per calendar day. The Construction Cost Estimate is $1,600,000
Bid Results
Industrial
$1,300,000.00
Public - State/Provincial
New Construction, Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 15, 2025
November 3, 2025
Sherwood Island Connector, Westport, CT
Related To This Project
Westport, CT
Bid Date: Oct 17 2025
Westport, CT
Bid Date: Oct 30 2025
Westport, CT
Bid Date: Nov 03 2025
Westport, CT
Bid Date: Nov 07 2025
Westport, CT
--
Westport, CT
--
Westport, CT
Bid Date: Dec 16 2025
Westport, CT
Bid Date: Mar 03 2026
Westport, CT
Bid Date: Oct 03 2025
Westport, CT
--
Westport, CT
Bid Date: Oct 03 2025
Westport, CT
Bid Date: Aug 22 2025
Westport, CT
Bid Date: Sep 22 2025
Westport, CT
Bid Date: Sep 11 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
