BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 8, 2025 at 8:00 PM

Updated August 23, 2025

Renovation of an elderly care / assisted living facility in Cattaraugus, New York. Completed plans call for the renovation of a elderly care / assisted living facility.

CR Number: 2125197 Please see attached RFQ and specifications for the replacement of a concrete patio at 47 Gail Drive, Cattaraugus NY 14719. Service-Disabled Veteran-Owned Set Aside: No Questions regarding the specifications of this project will be answered at the site visit along with the following Q&A period: Vendor Questions due: August 18th, 2025 - COB Responses due to vendors: August 20th, 2025 - COB The purpose of asking questions during the site visit is to obtain clarification to the enclosed Project Scope. In the event that modifications are needed to the Project Scope, the modifications will be distributed by the WNYDDSO Business Office to all contractors. Contractors are to prepare and submit their quotes based on the written Project Scope and any modifications made in writin At 47 Gail dr the WNYDDSO is looking for bids on replacing the concrete patio in the back yard-- The vendor shall provide all labor and materials necessary to complete the work in a professional manner according to scope of work and architectural drawings if supplied. Work is to be completed within 30 days of award. This is a NYS Public Works project and prevailing wages are to be paid. Refer to attached specification for the following scope of work. Site must be cleaned and all materials secured at the end of each work day. Absolutely no scraps, especially fasteners, are to be left unsecured. Upon completion of roof replacement before removal of equipment and scaffolding, contractor is to schedule a quality control and quality assurance inspection with Plant Superintendent. Bid price is to include all materials, labor, disposal of materials fees and site clean-up. Final acceptance of completed job will be provided by the appropriate Maintenance Supervisor. 2. Work is to be done between the hours determined by the approved safety plan, Monday through Friday. Contractor is advised that this is an occupied home and may be occupied during these times. 3. All tools must be controlled at all times and debris, tools and materials secured and stored at the end of each work day. 4. Any unforeseen conditions that may alter the established price are to be reported to the Plant Superintendent listed above immediately upon discovery. 5. Smoking is prohibited by contractors at all residential and program sites owned by OPWDD. 6. Prior to the commencement of the work, there shall be a meeting with DDSO Operations and Maintenance staff to discuss specific safety requirements needed to be adhered to during the work period. 7. Safety Data Sheets as applicable will be provided to the Plant Superintendent prior to the start of work and a copy maintained at the property. 8. All applicable environmental testing associated with this work will be provided to the contractor prior to start of work.

Post-Bid

Elderly Care / Assisted Living

$50,000.00

Public - State/Provincial

Renovation

6

4

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
313
Active Projects
175
Bidding Soon
2,145
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 22, 2025

September 22, 2025

Project location map

47 Gail Dr, Cattaraugus, NY

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.