BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 30, 2025 at 8:00 PM

Updated October 1, 2025

Site work and renovation of a civil project in Baltimore, Maryland. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.

The Project and Construction Management Assistance services to be provided include, but are not limited to, assisting the City Office of Engineering and Construction with construction monitoring and inspection, preparation of daily reports, maintenance of project records and documentation, review of contractor's application for payment, attendance at progress meetings, preparation of record drawings, review of contract claims and support documents, cost estimating, scheduling, time impact analysis, quality control, project engineering, constructability reviews, submittal reviews and responses, RFI reviews and responses, and other documents. Experience in Facilities Rehabilitation and Construction at Wastewater Treatment Plants. Experience in development and implementation of a Construction Project Management program for Wastewater Treatment Plants. Familiarity with standard construction inspection procedures and requirements for Civil, Structural, Mechanical, and Electrical disciplines, SCADA system, Effluent Filtersinstallation and implementation. Familiarity with the most current applicable building codes, Electrical NEC, and Wastewater Treatment Plant standards. Experience in providing and managing field inspection staff with Quality Control and Quality Assurance experience and with change orders and claims analysis. Experience with Critical Path Method construction scheduling, and Time Impact Analysis, using Primavera version 6 scheduling software. Experience with Primavera Contract Management version 14 and Unifier project tracking software. Overall team approach to utilize, coordinate, and manage, assigned tasks of the Minority/Women Business Enterprises partners, and conform to City goals. Construction Management Assistance for Sanitary Contract 1037 Effluent Sand Filter Rehabilitation at the Back River Wastewater Treatment Plant One contract will be awarded for a period of 2.5 years. Should you have any questions regarding the scope of the project, please contact Mr. Maung Htay at 443-984-3512 or by email at maung.htay@baltimorecity.gov. Additional Instructions The MBE goal is _30_% The WBE goal is _15_% Procurement Program Participation Goals MBE Participation (%): 30.00

Post-Bid

Water / Sewer

$6,000,000.00

Public - City

Renovation, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
567
Active Projects
258
Bidding Soon
3,809
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 26, 2025

May 26, 2026

Project location map

8201 Eastern Ave, Baltimore, MD


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.