BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 23, 2026 at 7:00 PM

Updated January 24, 2026

Site work and paving for a mixed-use development in Auburn, Alabama. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

https://www.auburnvillager.com/news/acs-board-approves-171m-bid-to-build-plains-high/article_bc0dd5c9-ab12-4fda-bc71-8a6b5550c946.html ACS Board approves $171M bid to build Plains High ____________________ Scope is as Follows: The Project Calls for the Construction of a New Comprehensive High School Facility, Including Related Site Work and Outdoor Athletic Facilities. The Site Includes 82 Acres of Previously Undeveloped Land Along North Donahue Drive in Auburn, Al. Early Site Improvements Are Underway Including Tree Clearing, Mass Grading, Mass Rock Excavation, and Installation of Storm Drainage, Sanitary Sewer Infrastructure, Curb & Gutter, and Asphalt Binder. The Building Scope Includes 3 Primary Structures: A Three-story Academic Building, a 2-story Gymnasium and Athletics Building, and a Single-story Performing Arts Building. The Primary Structural System for the Academic and Performing Arts Building is Steel Frame Structure With Infill Materials Ranging From Masonry, Stud Walls, Curtain Wall, and Storefront Glazing. Portions of the Gymnasium and Performing Arts Buildings Use Hollow Core Slab Structure With Load Bearing 388,000 Square Feet Distributed Throughout the 3 Buildings Serving an Enrollment of 2200 Students. In Addition to the Core Curriculum Spaces, There Are Multiple Career Tech Labs, a Dedicated Lecture Lab, a Full Music and Arts Suite, a Competition Gymnasium, Auxiliary Gym, Cafeteria and Commercial Kitchen, and an 850-seat Auditorium. All of the Spaces in the School Will Be Served by Both Wired and Wireless Technology as Well as the Most Up to Date Mechanical and Electrical Systems. Site Work Includes Tennis, Baseball, Softball, Track and Field and Multiple Practice Fields. Work Includes Multiple Field Buildings Serving Athletics, Parking, Signage, Fencing, Lighting and Various Plantings and Landscaping. A Cashiers Check or Bid Bond Payable to Auburn City Schools, in an Amount Not Less Than Five (5) Percent of the Amount of the Bid, but in No Event More Than $10,000, Must Accompany the Bidders Proposal. Performance and Payment Bonds and Evidence of Insurance Required in the Bid Documents Will Be Required at the Signing of the Contract.

Award

Roads / Highways

$170,948,000.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
16
Active Projects
3
Bidding Soon
583
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 2, 2025

January 1, 2026

Project location map

Multiple Locations, Auburn, AL


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.