Renovation of an educational facility in Brighton, Colorado. Working plans call for the renovation of a educational facility.
**As of October 8th, 2025, the owner has selected a Design Builder. A timeline for construction has not yet been established** Reference Number 0000394817 Henderson Elementary School RFQ/P for Design Build HVAC Replacements Location-Henderson Elementary School 12301 East 124th Avenue Henderson, Colorado 80640 Purpose: The purpose of this RFQ/P is to provide School District 27J Design Building HVAC Replacement services for Henderson Elementary School. To add new coils to classrooms, new piping ductwork as it pertains to the mechanical design, new boilers & to replace the temperature controls throughout the buildings. The existing corridor from building B & classrom 206 will be upgraded or maintained as a (1) hour corridor. A wall & pair ofdoors will be added to separate the (1) hour corridor from the existing system which is currently not rated. Rest of exit system will remain in its existing condition. Question Deadline 08/11/2025 at 4:00 PM MT Questions are submitted online No, All questions are to be emailed to Karley Olson at karley@kopmanagement.com The District will only accept an e-mail response to this Request for Proposal. You are responsible to address the email to Karley Olson at karley@kopmanagement.com Construction: May 2026 - August 2026 The existing AHUs, RTUs, Exhaust Fans, etc. are nearing the end of their useful life and replacement is necessary to improve energy efficiency, enhance indoor comfort, and ensure reliable operation of the HVAC system. 1. Project Objectives a. Replace existing RTUs/AHUs, Exhaust Fans, etc. with like for like, new, energyefficient units meeting or exceeding industry standards. i. Henderson ES - Constant Volume 1. Replacement of RTUs 2-11, AHU 1-2, Exhaust Fans 2. MAU - Replacement and create dedicated MAU to Kitchen Hoods, currently serving cafeteria and kitchen together 3. Controls: Setpoint 4. Equipment Manufacturers: Trane, Aaon, Daikin 5. Add Alternate H1: Boiler Replacements b. Optimize the HVAC system for improved indoor air quality and thermal comfort for occupants. c. Minimize disruption to building operations and occupants during the replacement process. d. Ensure structural integrity of the building to support the new equipment e. Achieve cost-effectiveness through efficient design, installation, and long-term operation of the new system. 2. Scope of Work: a. The selected Design-Build team will be responsible for all aspects of the HVAC replacement project, including, but not limited to: i. Existing conditions assessment: Thorough evaluation of existing equipment, associated controls, ductwork, roof structure, and electrical infrastructure. Review existing equipment to confirm if equipment is still needed (i.e., old exhaust fans that may just need to be removed and not replaced). ii. Design: Development of detailed plans and specifications for the new equipment, including sizing, selection, controls, structural modifications (if needed), and electrical upgrades. Sustainable design alternatives and their feasibility should also be evaluated. iii. Permitting: Obtaining all necessary permits and approvals from relevant authorities having jurisdiction. iv. Procurement: Sourcing and acquiring the new equipment and associated materials. v. Installation: Removal of existing equipment and installation of the new units, including all required mechanical, electrical, and structural work. vi. Coordination: Collaboration with the District's Construction Department, Facilities Department, and School Staff to ensure seamless project execution. vii. Commissioning: Testing and balancing of the new equipment and controls to ensure proper operation and optimal performance. Coordination with Owner's Commissioning Consultant for full commissioning of systems. viii. Closeout: As-Builts, Warranties, Owner Trainings, Operational and Maintenance Manuals
Pre-Construction/Negotiated
Educational
$70,000.00
Public - County
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 3, 2025
May 19, 2026
12301 E 124th Ave, Brighton, CO
Related To This Project
Brighton, CO
Bid Date: Sep 15 2025
Brighton, CO
Bid Date: Sep 10 2025
Brighton, CO
Bid Date: Sep 06 2025
Brighton, CO
Bid Date: Sep 16 2025
Brighton, CO
Bid Date: Dec 19 2025
Brighton, CO
Bid Date: Sep 22 2025
Brighton, CO
Bid Date: Sep 04 2025
Brighton, CO
Bid Date: Aug 06 2025
Brighton, CO
Bid Date: Aug 15 2025
Brighton, CO
Bid Date: Aug 08 2025
Brighton, CO
Bid Date: Jul 28 2025
Brighton, CO
Bid Date: Jul 31 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.