Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published August 14, 2025 at 8:00 PM
Updated August 15, 2025
Site work for a water / sewer project in Marina del Rey, California. Completed plans call for site work for a water / sewer project.
The Contractor shall provide all supervision, labor, equipment, parts and materials to install approximately seventy-two (72) feet of security gate to the height of approximately eight (8) feet. Additionally, the contractor shall perform a patch repair on the existing interior security gate that was damaged by a vehicle allision. Project Location - U.S. Coast Guard Facility Marina Del Rey, CA USCG Marina Del Rey Facility, CA 90292. 13871 Fiji Way, Marina Del Rey, CA 90292. Scope of Work Installation of Security Gate: Total length: ~72 feet Height: ~8 feet Includes: 15-foot electric slide gate for vehicles Manual pedestrian access gate 5-foot floating panel near water's edge to prevent trespassing during low tide Repair Work: Patch repair on existing interior security gate damaged by vehicle allision Location: USCG Marina Del Rey Facility 13871 Fiji Way, Marina Del Rey, CA 90292 Important Dates Seller Question Deadline: August 11, 2025 - 11:00 AM ET Instructions for Q&A Submit questions using the "Submit a Question" button. The solicitation will be reposted with Q&A responses if applicable.
Post-Bid
Water / Sewer
$300,000.00
Public - Federal
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 13, 2025
September 12, 2025
13871 Fiji Way, Marina del Rey, CA
Related To This Project
Marina del Rey, CA
Bid Date: Dec 17 2025
Marina del Rey, CA
--
Marina del Rey, CA
Bid Date: Mar 20 2025
Marina del Rey, CA
Bid Date: Jan 15 2025
Marina del Rey, CA
Bid Date: Dec 23 2024
Marina del Rey, CA
--
Marina del Rey, CA
--
Marina del Rey, CA
Bid Date: Sep 10 2024
Marina del Rey, CA
Bid Date: Nov 30 2023
Marina del Rey, CA
--
Marina del Rey, CA
Bid Date: Feb 21 2022
Marina del Rey, CA
--
Marina del Rey, CA
--
Marina del Rey, CA
Bid Date: Mar 15 2022
Marina del Rey, CA
Bid Date: May 16 2023
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
