Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published November 5, 2025 at 7:00 PM
Updated November 6, 2025
Renovation of an educational facility in Byron, Georgia. Working plans call for the renovation of a educational facility.
The projects will include site work, building construction, selective demolition, renovation/modification of existing facilities. Question Deadline 09/05/2025 Any questions regarding this Request shall be submitted in writing to the Architect at the address listed below or email. Architect will respond to any respondents questions received within four calendar days of the submittal due date. The Construction Management at Risk services shall include a Pre-Construction Design Phase and a Construction Phase. The CM will provide comprehensive administration and management of all aspects of the construction of the project and will work in concert with the A/E towards the successful completion of the project on schedule, at or less than budgeted costs, meeting or exceeding standards stipulated by the construction documents, and in adherence with standards required by local authorities and other agencies having jurisdiction. The CM, either through in-house staff or outside consultant/contractors, will serve as a construction manager/contractor or provide all construction services and activities necessary for the design, construction, and occupancy of the project. The services described in this Request are representative of the services required but do not constitute a comprehensive specification. A comprehensive specification of the Scope of Services required is contained in the proposed Construction Management Agreement that will be issued to all short-listed respondents. Any questions regarding this Request shall be submitted in writing to the Architect at the address listed below or email. Architect will respond to any respondent's questions received within four calendar days of the submittal due date. One (1) Digital Copy sent directly to: SP Design Group Architects and Engineers, Inc. Attention: Rodney W. Wilson rww@spdesigngrp.com P.O. Box 6254 (31208) 5191 Columbus Road Macon, GA 31206 Project Schedule The Architect (A/E) has prepared a Preliminary Total Project Schedule that targets July 15, 2026 for substantial completion of the scope of work. The CM will be responsible for reviewing and incorporating milestones shown in the Preliminary Total Project Schedule into his own Total Project Schedule. Construction Budget The preliminary construction budget of the scope of work is $7,000,000. Final project SCL to be determined by PEACH COUNTY BOARD OF EDUCATION at the completion of pre-construction services by the successful CM. It is the sole responsibility of the respondents to assure delivery to the appropriate party. The owner cannot accept responsibility for incorrect delivery, regardless of reason. No submittals will be accepted after the time stipulated above. Qualification's submittal will not be accepted via facsimile. The Owner reserves the right to reject any or all Proposals received. The Owner is not obligated to request clarifications or additional information but may do so at its discretion. The Owner reserves the right to extend the deadline for submittals.
Final Planning
Educational
$7,000,000.00
Public - County
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
5
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 11, 2025
May 11, 2026
201 Linda Dr, Byron, GA
Related To This Project
Byron, GA
Bid Date: Oct 09 2025
Byron, GA
--
Byron, GA
Bid Date: Jul 09 2025
Byron, GA
Bid Date: Jun 04 2025
Byron, GA
Bid Date: May 15 2025
Byron, GA
Bid Date: Jan 14 2025
Byron, GA
Bid Date: Jan 13 2025
Byron, GA
Bid Date: Dec 17 2024
Byron, GA
Bid Date: Dec 17 2024
Byron, GA
Bid Date: Nov 14 2024
Byron, GA
Bid Date: Sep 04 2024
Byron, GA
Bid Date: Aug 13 2024
Byron, GA
Bid Date: Aug 15 2024
Byron, GA
Bid Date: Aug 09 2024
Byron, GA
Bid Date: Aug 09 2024
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
