BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 24, 2025 at 7:00 PM

Updated November 25, 2025

Site work for a civil project in Gloucester, Massachusetts. Completed plans call for site work for a water / sewer project.

**As of August 18th, this project has been awarded to SumCo Eco Contracting. Haskell Pond Dam: Design Storm & Seismic Improvements Required for DCAMM contracts over $150,000, Highway Division contracts over $50,000. The work on the Haskell Pond Dam Rehabilitation project, includes but is not limited to: 1. Mobilize to the project site; coordinate and establish temporary utility crossing(s), site access and staging areas. 2. Install erosion controls. 3. Clear, grub, and strip all vegetation on the dam embankment and within 20 feet of the left and right abutments and the downstream toe of the dam. 4. Excavate the embankment crest to create a working platform for the secant pile wall installation. 5. Install the secant pile wall along the downstream side of the dam. 6. Install the reinforced concrete parapet atop the secant wall along the downstream slope to raise the height of the dam to elevation 114.6 feet. 7. Regrade the crest to a uniform elevation of 111.0. 8. Regrade the upstream slope to a uniform slope. Reuse granite block armor stone and supplement upper section with dumped riprap. 9. Regrading of the downstream slope to 2.5H:1V. 10. Install the blanket drain and two-stage filter toe drain along the downstream slope including manhole with flow measurement devices and discharge conduit/outfall 11. Install 3 seismic monitors at the stated locations along the dam/structures including telemetry and necessary data/electrical conduits. 12. Loam and seed dam embankment and areas disturbed by construction. 13. Dispose of unsuitable soils and construction debris. 14. Return the staging area and access roads to the pre-construction condition and demobilize from the site. 15. Coordinate with the Owner to install two survey monuments at the dam. 16. Complete an as-built survey Complete an as-built survey and provide close-out documentation. Question Deadline 09/10/2025 Any prospective bidder requesting a change in or interpretation of existing specifications of terms and conditions must do so at least five (5) days, excluding Saturdays, Sundays and Holidays, before the scheduled bid opening date.

Bid Results

Water / Sewer

$7,240,421.00

Public - City

Site Work

20

17

22

8

Subscribe For Documents

54 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
513
Active Projects
283
Bidding Soon
3,756
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 25, 2025

October 22, 2025

Project location map

10 Forest Ln, Gloucester, MA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.