Site work for a transportation facility in Tulsa, Oklahoma. Completed plans call for site work for a transportation facility.

The TAIT anticipates this contract will be funded in part by a Federal Aviation Administration Airport Improvement Program Grant. The TAIT seeks an experienced qualified firm(s) to provide all material, labor, supervision, tools, equipment, and incidentals necessary for the replacement and upgrading of a portion of airfield security fencing. The project will also consist of improving drainage systems and demolishing sections of deteriorating concrete. Bids received more than ninety-six (96) hours, excluding Saturdays, Sundays, and holidays, before the time set for opening of bids, as well as bids received after the time set for opening of bids, will not be considered and will be returned unopened. All bids must be accompanied by a certified or cashier's check, Bidder's Bond, or irrevocable letter of credit in the amount of not less than five percent (5%) of the bid, made payable to TAIT; and in the event TAIT shall award the contract to the bidder and the bidder shall fail, within fifteen (15) days from the making of such award, to enter into the contract and furnish the bonds and insurance as required, the amount of the certified check shall be retained by TAIT as liquidated damages; or, if a bid bond or letter of credit is submitted, the amount thereof shall then be immediately due and payable. By submitting a bid the Contractor certifies that it, and its proposed subcontractors, has under its direct control or at his disposal the personnel, equipment and materials required to execute the Project work as specified. Lack of such control or availability of personnel, equipment and materials shall constitute failure to properly execute the contract. The TAIT reserves the right to reject any or all bids and to waive any minor technicalities in bidding. No bid may be withdrawn for a period of ninety (90) days after the opening thereof. The following information is provided to communicate expectations for the selected firm. This Agreement will be funded in part by a grant from the Federal Aviation Administration, therefore the requirements of Title 49 CFR Part 26, Participation by Disadvantaged Business Enterprises, applies to this Agreement. The Consultant shall carry out applicable requirements of 49 CFR Part 26 in the award and administration of an Agreement formed as a result of this selection process. TAIT has set an aspirational DBE goal of 2.2% for the construction contract of TUL Security Fence Improvements. If a proposer or subconsultant of the proposer are certified as DBE, the work performed by both shall be counted towards meeting the aspirational goal. Any work performed by a non-DBE proposer or subconsultant does not qualify towards the DBE goal. As a condition of responsiveness to this Notice, firms must complete and submit the forms provided, "Bidders List", "Utilization Statement", "Schedule for Participation by DBE", DBE Regular Dealer/Distributor Affirmation Form" and if applicable "Request for Good Faith Efforts Review" with its submittal. Firms and Firms' subcontractor/subconsultant who are submitting as DBE's must be certified DBE in the state of Oklahoma in good standing prior to the date submittals are due. TAIT recognizes DBE firm certifications by the Oklahoma Department of Transportation (OKDOT). For information regarding DBE firms recognized by TAIT, or if you have any questions about TAIT'S DBE program, please contact Sandra Charon, TAIT DBE Liaison Officer, at 918-838-5016. Consultant selection is conditioned upon the selected firm satisfying the good faith efforts requirement of 49 CFR 26.53. The Consultant or Sub-Consultant shall not discriminate on the basis of race, color, national origin, or sex in the performance of this Agreement. Failure by the Consultant to carry out these requirements is a material breach of Agreement, which may result in the termination of this Agreement or such other remedy, as the TAIT deems appropriate. The bidder to whom a contract is awarded will be required to furnish public liability and workmen's compensation insurance; performance, statutory and maintenance bonds acceptable to TAIT, in conformity with the requirements of the proposed contract documents. The performance, statutory and maintenance bonds shall be for one hundred percent (100%) of the contract price. Question Deadline 08/21/2025: A request for clarification or interpretation of the Project Documents must be made in writing to the Engineer at least seven (7) calendar days prior to the Proposal opening date.

Award

Transportation Terminals

$363,496.00

Public - Federal

Site Work

25

8

15

5

Subscribe For Documents

33 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
139
Active Projects
76
Bidding Soon
1,014
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 28, 2025

September 29, 2025

Project location map

7777 Airport Dr, Tulsa, OK

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.