BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 22, 2025 at 8:00 PM

Updated August 23, 2025

Demolition, site work and asbestos abatement for a residential development in College Station, Texas. Completed plans call for the demolition of a 26,277-square-foot, three-story above grade residential development; for site work for a residential development; and for asbestos abatement for a residential development.

The City of College Station invites qualified contractors to submit bids for the asbestos abatement, demolition, and clean-up of building number two (2) at 1501 Holleman Dr. Question Deadline 08/14/2025 at 2:00 PM CT Questions and inquiries about this bid should be submitted in writing via the Q&A feature available online via the Brazos Valley e-Marketplace ("Bidding Portal"). The City of College Station seeks proposals from qualified demolition contractors to provide all labor, equipment, materials, permits, and supervision necessary to perform the demolition of a designated dangerous building within a residential apartment complex. The structure was deemed dangerous by the Construction Board of Adjustments following a fire incident. The City intends to initiate demolition if the property owner fails to act within the given timeframe. Site and Structure: Project Address: 1501 Holleman Dr. Legal Description: ANDERSON RIDGE PH 2, BLOCK 2, LOT 1, ACRES 6.68 & ASSOCIATED BPP Approximate Building Size and Construction Type: Three stories/Type 5 Construction Material/26,277 SQ ft. Known Hazards and Site Conditions: Asbestos-containing materials may be present. All utilities, including gas, electricity, water, and telecommunications, are to be confirmed and disconnected before demolition. The contractor provides utility disconnect verification. Scope of Demolition Work: Contractors shall complete the demolition of the existing structure, including foundations and underground utility services. The parking lot and adjacent buildings will remain and shall be protected during demolition. Remove all the fencing associated with the structure. Grade the site to the surrounding contour, and hydro mulch upon completion. General Requirements: All demolition work shall be conducted in accordance with the City of College Station Building Department regulations and permit requirements. The contractor shall be responsible for securing all permits, inspections, and utility verifications. Required Inspections: Verification of utility cutoffs before beginning demolition activities. Final inspection upon completion of demolition and grading by the Building Official

Bid Results

Residential Subdivision

$58,727.00

Public - City

Asbestos Abatement, Demolition, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

8

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
80
Active Projects
3
Bidding Soon
2,011
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 20, 2025

September 19, 2025

Project location map

1501 Holleman Dr, College Station, TX

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.