BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 18, 2025 at 8:00 PM

Updated August 19, 2025

Site work and paving for a sidewalk / parking lot in Amboy, Illinois. Working plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

As of August 18, 2025, no bids received for the project. No definite date for rebid. Sealed Bids will be received by the City of Amboy for "2025 Sidewalk Project and is further described as follows: The City of Am-boy is requesting proposals for the construction of 534 of Newly Constructed sidewalk. The lowest responsible bidder will be notified of the award from the ex-ecution of the Notice of Award. The location of this project starts at N Metcalf Ave and E Bacon St and will go East on the North side of Bacon for 534. The work shall include all labor, equipment, materials and related items necessary to complete the newly constructed sidewalk, various earth excavation, forming, grading. - delivery and placement -of aggregate base -course and placement and finishing of Port land Cement Concrete to construct sidewalks within the City limits of Amboy as deemed necessary by the City Council. The sidewalk - shall be constructed In accordance with the appropriate ADA Guide-lines and be construct-ed to the Illinois Depart-ment of Transportation Standard Specifications for Road and Bridge Construction, which will be considered the Standard Specifications for this contract. The City of Amboy will assist in the preliminary grade needed for the project and the selected bidder will be responsible for the final grade specifications. All sidewalks shall include 4 (four) inches of Aggregate Base Course, CA-6 which meets IDOT Specifications. The PCC Sidewalk shall be 4" thick, minimum and a minimum width of 5 (five) feet. All necessary sealant, expansion joint material, tie bars (if needed), saw cutting, jointing, and any proper rebar or wire mesh reinforcement material will be required, and all related items shall be completed in accordance with the Stan-dard Specifications. The Potential Bidder shall submit a cover letter with Business Name and Address, a short resume of recent-ly completed projects of similar type and the following Bid Schedule with an assigned UNIT PRICE for SQUARE FOOT OF PCC SIDE-WALK, 4" as shown below. Bid Schedule Item Description Unit Unit Price 1. Installation PCC Sidewalk 4" S.F. Bidders are advised that this Contract will be subject to the Illinois Prevailing Wage Act. The Owner, City of Am-boy, reserves the right to reject any and all Bids and to waive any informality in the bid-ding.

Final Planning

Sidewalks / Parking Lot

$600,000.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
331
Active Projects
195
Bidding Soon
2,341
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 15, 2025

February 18, 2026

Project location map

Multiple Locations, Amboy, IL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.