BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 28, 2025 at 8:00 PM

Updated August 29, 2025

Site work and renovation of a mixed-use development in Montauk, New York. Completed plans call for site work for a clubhouse / community center; golf course; and for the renovation of a 16,000-square-foot clubhouse / community center.

CR Number: 2125242 The New York State Office of Parks, Recreation and Historic Preservation (OPRHP) is soliciting proposals for Construction Management (CM) services to support the rehabilitation of the golf course Clubhouse and associated site work at Montauk Downs State Park. Estimated Construction Duration: 20 months Approximate Construction Cost: $12.5 million The clubhouse is approximately 16,000 square feet across two primary levels. The main level is ~9,800 SF and includes public spaces such as the lobby, locker rooms, kitchen/bar, and dining areas. The lower level is ~6,200 SF and includes storage, cart barn access, and support areas. The building features a concrete frame and slab-on-grade structure with low-slope roofs and expansive glazing. It was constructed in the mid-1960s and is considered a significant example of mid-century modern architecture. The proposed project includes extensive concrete and facade repairs, a new decking system, elevator installation, interior reconfiguration, and improving of finishes, locker rooms, and restrooms. The design incorporates flood resilience measures and envelope improvements while respecting the building's architectural character. Site improvements include new ADA ramps, retaining walls, landscape restoration, drainage, and exterior restroom upgrades to support continued public use and operations at this flagship state park golf course. Construction is anticipated to commence in August 2026 after OSC approval, with substantial completion by January 2028 and final close-out by April 2028. These dates are approximate and subject to revision but note the schedule the Construction Manager will be responsible to ensure the contractors meet or accelerate where possible. Project Objectives This work includes, but is not limited to: Structural repairs and waterproofing of concrete waffle slab New parapets walls and waterproofing New decking system New trench drain system New ADA-compliant elevator and entry ramps. Window and door replacement Locker room, restroom, and finish upgrades MEP and fire protection system upgrades Custom millwork and interior fixtures Site Work Scope Selective demolition and grading ADA accessibility upgrades Stormwater infrastructure upgrades New sidewalks, ramps and curbs Site restoration and plantings Minority Owned Sub-Contracting Goal: 15% Women Owned Sub-Contracting Goal: 15% Service-Disabled Veteran-Owned Business Contracting Goal: 6%

Post-Bid

Golf Course

$12,500,000.00

Public - City

Renovation, Site Work

6

32

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
377
Active Projects
195
Bidding Soon
2,468
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 27, 2025

August 1, 2026

Project location map

50 S Fairview Ave, Montauk, NY

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.