Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published September 4, 2025 at 8:00 PM
Updated September 5, 2025
Site work and paving for a mixed-use development in Edwardsburg, Michigan. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.
The work for which bids are being requested consists of the following: Contract 1.1 miles of path along Elkhart Road in Edwardsburg, MI including tree removals, grading, concrete sidewalk, replacement of existing hydrants, storm sewer installation, driveway replacements, and various appurtenances. Please note that the Cass County Road Commission will be handling HMA pavement work for this project, awarded contractor will be required to coordinate with them on construction operations. A certified check or bank draft drawn on a solvent bank in the State of Michigan payable without condition to the OWNER or a satisfactory bid bond executed by the bidder and a surety company, in an amount equal to 5 percent of the bid shall be submitted with each bid. No bids may be withdrawn after the scheduled closing time for receipt of bids for at least ninety (90) days. The successful bidder will be required to furnish a satisfactory Performance Bond and a Labor and Material Bond in the amount of 100 percent of the Contract price. Bond forms are included in the Contract Documents. The OWNER reserves the right to reject any or all bids and to waive any irregularities in bidding. The use of local contractors and labor is encouraged. Project Review :- Project consists of construction a pedestrian trail along the side of Elkhart Road within the existing ROW The path will be a 6 ft sidewalk through the Village, widening to a 8 ft HMA path in the Township Some temporary grading easements will be required to help facilitate drainage and are being handled by the County Drainage swales are intended to be minimal and to facilitate water getting off the road and trail (not deep ditches) The CCRC will be doing the paving work on this project for HMA. Coordination is required. There is a bid alternate for Aggregate Base work Utility relocations are ongoing for AEP and Frontier and expected to be completed by Sept 25th Work Begins Sept 8, 2025; Substantial Completion October 24, 2025; Completion of Punchlist Work 2 Weeks After Sub. Completion
Post-Bid
Roads / Highways
$600,000.00
Public - County
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 27, 2025
September 8, 2025
Elkhart Rd, Edwardsburg, MI
Related To This Project
Edwardsburg, MI
Bid Date: Sep 15 2025
Edwardsburg, MI
Bid Date: Aug 06 2025
Edwardsburg, MI
Bid Date: Jun 24 2025
Edwardsburg, MI
Bid Date: May 08 2025
Edwardsburg, MI
Bid Date: May 02 2025
Edwardsburg, MI
Bid Date: Apr 25 2025
Edwardsburg, MI
Bid Date: Apr 01 2025
Edwardsburg, MI
Bid Date: Mar 18 2025
Edwardsburg, MI
Bid Date: Mar 11 2025
Edwardsburg, MI
--
Edwardsburg, MI
--
Edwardsburg, MI
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
