Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published August 9, 2025 at 8:00 PM
Updated August 10, 2025
Site work, paving and outdoor lighting for a mixed-use development in South Bend, Indiana. Conceptual plans call for site work for a road / highway; for outdoor lighting for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.
Local Public Agency: City of South Bend Project Location: Western Avenue Transformation District Project Description: Engineering design for the public infrastructure and parking lots for a new mixed income residential community in South Bend. The project area includes the area bounded by Western Avenue to the North, South Street to the South, Scott Street to the West, and Taylor Street to the East (Rabbi Shulman/Monroe Circle Site), and City-owned properties to the northeast of the intersection of Taylor and Western. The scope includes utility design, two new street connectors between Taylor and Scott, including curbs, sidewalks, striping, street lighting, and street trees, one raised intersection on Western, parking lot design, and a stormwater management plan, including on site underground stormwater storage. The project will also include boundary survey and plat preparation for a major subdivision to establish the public ROW for the new street. The project will be two phases, with preliminary design for the entire project and full design for Phase 1, which includes the northern portion of the Rabbi Shulman/Monroe Circle Site and the City-owned properties. Phases Included: PE, RW Estimated Construction Amount: $850,000 Funding: Section 108 HUD Loan Term of Contract: Until Project Completion DBE goal: 5% INDOT - RFP Engineering - Western Avenue Transformation District
Conceptual
Roads / Highways
$850,000.00
Public - City
Outdoor Lighting, Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 9, 2026
Western Ave, South Bend, IN
Related To This Project
South Bend, IN
Bid Date: Sep 10 2025
South Bend, IN
Bid Date: Sep 09 2025
South Bend, IN
Bid Date: Jan 27 2026
South Bend, IN
Bid Date: Sep 24 2025
South Bend, IN
Bid Date: Dec 11 2025
South Bend, IN
Bid Date: Sep 18 2025
South Bend, IN
--
South Bend, IN
Bid Date: Sep 17 2025
South Bend, IN
Bid Date: Sep 09 2025
South Bend, IN
Bid Date: Sep 30 2025
South Bend, IN
Bid Date: Aug 12 2025
South Bend, IN
Bid Date: Aug 12 2025
South Bend, IN
Bid Date: Aug 12 2025
South Bend, IN
Bid Date: Aug 12 2025
South Bend, IN
Bid Date: Aug 12 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
