Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published September 19, 2025 at 8:00 PM
Updated September 20, 2025
Site work for a playground / park / athletic field in Nordegg, Alberta. Completed plans call for site work for a playground / park / athletic field.
Crescent Falls Provincial Recreation Area (PRA) underwent infrastructure refurbishment over the course of 2022 to 2024. After these upgrades were completed and the site opened to the public in the summer of 2024, (Central Region) Parks Division identified a need for additional site enhancements based on public use. Operations has requested the addition of a guardrail barrier to one section of the viewing structure to mitigate public access concerns as well as the replacement of the existing maintenance access hatch with a lighter-weight alternative. The work aims to enhance public safety by modifying the existing viewpoint structure. 1. All work shall be in accordance with all local and provincial codes and regulations. All work shall be performed by qualified trades workers, tested and under warranty for a period of one (1) year from acceptance date of work. 2. The Contractor shall provide all labour, materials, tools, equipment and services including the transportation necessary to complete the work. The intent is that the Contractor provides a complete job. Demolition and disposal costs are to be included in the Contractor's quote. Site is to be clear of all debris upon completion of demolition work. 3. The Contractor shall be responsible for all damages to the structure or site as a result of this work, activities of this work and activities of their employees and/or subcontractors or their negligent security arrangements. Damages shall be repaired to pre-construction conditions or better at Contractor's own expense. 4. All shop drawings and materials shall be as specified and formally approved by the project's structural engineer and Alberta Parks before Contractor commences work. The costs of any changes affecting other disciplines, including approved alternatives, shall be included in the bid.
Award
Playgrounds / Parks / Athletic Fields
$80,083.00
Public - State/Provincial
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 25, 2025
September 1, 2025
Crescent Falls Public Recreation Area, Nordegg, AB
Related To This Project
Nordegg, AB
Bid Date: Oct 28 2025
Nordegg, AB
Bid Date: Aug 14 2025
Nordegg, AB
Bid Date: Jul 07 2025
Nordegg, AB
Bid Date: Jun 12 2025
Nordegg, AB
Bid Date: Apr 25 2025
Nordegg, AB
Bid Date: Apr 18 2025
Nordegg, AB
Bid Date: Mar 27 2025
Nordegg, AB
Bid Date: Jan 29 2025
Nordegg, AB
Bid Date: Nov 14 2024
Nordegg, AB
Bid Date: Oct 04 2024
Nordegg, AB
Bid Date: Sep 10 2024
Nordegg, AB
Bid Date: Aug 26 2024
Nordegg, AB
Bid Date: Aug 22 2024
Nordegg, AB
Bid Date: Jun 09 2025
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
