Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published September 23, 2025 at 8:00 PM
Updated September 24, 2025
Site work for a water / sewer project in Piedmont, Wyoming. Working plans call for site work for a water / sewer project.
9/23/25: This has been cancelled at this time. Please follow project for future updates. Questions must be submitted online no later than 2:00 P.M. Mountain Time on, SEPTEMBER 3, 2025. Questions submitted after this deadline may not be accepted or considered. This project has six (6) treatment units. All units are marked by an orange flagged boundary. Knots and flagging 'tails' point into the units. The primary tree species to be treated is lodgepole pine. The objective is to thin lodgepole pine stands to a designated spacing to improve forest health, vigor, reduce fire risk, and provide enhanced economic value. Trees to be thinned range from one inch (1") to four and nine-tenths inches (4.9"). Desired spacing is eight feet (8') by eight feet (8') for a residual spacing ofsix hundred eighty (680) trees per acre Slash will be lopped and scattered. Trees will be cut to no more than four foot (4') lengths, limbs severed from the bole ofthe tree, and the resulting slash scattered to a depth ofno more than eighteen inches (18"). No cutting operations will be allowed on site from September 1st until May 1st unless otherwise approved by the District Forester. Location T. 12 N., R. 117 W., Section 16, Uinta County, WY ACCESS: From Mountain View WY: o Head south out ofMountain View on WY-410 for approximately 14 miles and then turn left onto County Road 271 (Meeks Cabin Rd). o Travel south on CR 271 for 14 miles to Private Access Rd and turn right. o Proceed 1.5 miles west on Private Access Rd to stream crossing and head north to Fish Creek State Section Line. The project area is located behind locked gates through private property, prospective bidders should contact the Assistant District Forester for bid tours. TSI Unit A- 4 acres TSI Unit B- 11 acres TSI Unit C- 2 acres TSI Unit D- 2 acres TSI Unit E- 10 acres TSI Unit F- 14 acres South Fish Creek Timber Stand Improvement
Final Planning
Water / Sewer
$30,000.00
Public - State/Provincial
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
5
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 8, 2025
January 5, 2026
Multiple Locations, Piedmont, WY
Related To This Project
Piedmont, WY
--
Piedmont, WY
--
Piedmont, WY
--
Piedmont, WY
--
Piedmont, WY
--
Piedmont, WY
--
Piedmont, WY
--
Yellowstone National Park, WY
Bid Date: Sep 09 2025
Cheyenne, WY
Bid Date: Sep 15 2025
Cheyenne, WY
Bid Date: Sep 11 2025
Casper, WY
Bid Date: Aug 20 2025
Wright, WY
Bid Date: Aug 27 2025
Laramie, WY
Bid Date: Aug 20 2025
Cheyenne, WY
Bid Date: Aug 07 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
