BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 5, 2025 at 8:00 PM

Updated September 6, 2025

Site work for a water / sewer project in Midland, Ontario. Completed plans call for site work for a water / sewer project.

The Town of Midland (the "Town") has a requirement for the supply of all labour, equipment, and materials necessary for the complete and satisfactory drilling, sampling, construction, development and testing of one (1) 203 millimetre (mm) (8-inch) x 305 mm (12-inch) diameter single-cased supply well to yield approximately fifteen (15) litres per second (L/s) (198 Imperial Gallons per Minutes (IGM)) of clear, sand-free water (the "Work"). Well 15 is a 50 m deep groundwater supply well constructed in overburden in April 1985 with a 206 millimeter (mm) inside diameter steel casing to 40.37 metres (m) below ground surface (mbgs), and a 168 mm inside diameter, 0.76 mm (30-slot (0.03-inch)) wire wound stainless steel screen from 40.37 to 46.55 mbgs. A filter pack, composed of 0.61 to 0.80 mm (0.02 to 0.03 inch) diameter silica sand, was placed within the 305 mm diameter annulus from a depth of 35.0 mbgs to 50.0 mbgs. A submersible pump is installed within the well, with an intake depth of 42.0 mbgs based on the last well rehabilitation completed in 2019. Following the initial testing of the well it was determined that the safe yield was at least 15.0 L/sec (Groundwater Solutions Ltd., 1987). A 50-mm monitoring well (MW 17683) is located approximately 21 m east of Well 15 and three multi-level monitoring wells (Hanly-Manly MW) are located approximately 91.5 m north of Well 15 (see Figure 2, Appendix A). The multi-level monitoring wells were constructed with 32-mm diameter steel pipes with pipe size screens set at depths of 30.25 to 30.97 (shallow), 40.34 to 41.06 (intermediate) and 51.79 to 52.51 (deep) mbgs (Groundwater Solutions Ltd., 1987). Well 15 is operated by the Town under Permit to Take Water (PTTW) No. 2406-AKPQ83 for the Midland water supply issued by the Ministry of Environment, Conservation and Parks (MECP) on May 3, 2017. The PTTW allows for a maximum taking rate of 912 litres per minute (1,309,200 litres per day). Due to deteriorating well condition and the decreased yield observed during well rehabilitation and performance testing activities, the Town intends to construct a new well to replace Well 15 at the current site The contract for the work will be between the successful bidder (the "Contractor") and the Town. The Contractor's work will be observed by the Town's Representative (the "Consultant") who will observe and enforce the contract conditions. Question Deadline: Mon Aug 25, 2025 4:30:00 PM (EDT) Duration in months: 3 Written answers or clarifications to issues of substance will be shared with all Bidders and will be issued as part of the RFT in the form of an Addendum. Questions related to this bid are to be submitted to the Purchasing representative through the Bidding System only by clicking on the "Submit a Question" button for this specific bid opportunity. Documents can be obtained from https://midland.bidsandtenders.ca/ Award is subject to final approval

Award

Water / Sewer

$273,629.00

Public - City

Site Work

6

8

2

3

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
200
Active Projects
58
Bidding Soon
2,495
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 4, 2025

September 17, 2025

Project location map

365 Hanly St, Midland, ON


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.