Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published September 9, 2025 at 8:00 PM
Updated September 10, 2025
Site work and paving for a mixed-use development in New Haven, Michigan. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.
1.14 mi of hot mix asphalt shared-use path including crack sealing, joint repair, and concrete sidewalk ramp upgrade along Clinton River Spillway from Gratiot Parkway to Metropolitan Parkway, Macomb County. This is a Local Agency project. Net classification required for this project is 603 Cb or Comb/Jt. 603 Ea, N9-3G In addition to the above minimum prequalification requirement for prime contractors this project includes subclassifications of Cb, Ea and N9-3G. If the prime contractor is not prequalified in those subclassifications it must use prequalified subcontractors. Those subcontractors must be designated prior to award of the contract to the confirmed low bidder. Control Sec Job No Federal No TAU 50000 220416A 25A0774 Completion Date: 6/15/2026 MIDOT - 2509 017 - Hot Mix Asphalt Shared-Use Path Including Crack Sealing, Joint Repair, and Concrete Sidewalk Ramp Upgrade Along Clinton River Spillway
Award
Roads / Highways
$493,738.00
Public - State/Provincial
Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
5
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 5, 2025
September 15, 2025
Clinton River Spillway, New Haven, MI
Related To This Project
New Haven, MI
Bid Date: Oct 14 2025
New Haven, MI
Bid Date: Sep 26 2025
New Haven, MI
Bid Date: Nov 18 2025
New Haven, MI
Bid Date: Nov 18 2025
New Haven, MI
Bid Date: Dec 18 2025
New Haven, MI
Bid Date: Jan 16 2026
New Haven, MI
Bid Date: Jan 16 2026
New Haven, MI
Bid Date: Feb 06 2026
New Haven, MI
Bid Date: Jul 15 2025
New Haven, MI
Bid Date: Jul 11 2025
New Haven, MI
Bid Date: Jun 06 2025
New Haven, MI
Bid Date: Apr 23 2025
New Haven, MI
Bid Date: Apr 22 2025
New Haven, MI
Bid Date: Apr 17 2025
New Haven, MI
Bid Date: Apr 07 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
