BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 19, 2025 at 8:00 PM

Updated September 20, 2025

Site work and paving for a mixed-use development in Blaine, Minnesota. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

Furnishing of All Work And Materials for Consideration of City Improvement Project And Consisting of Approximately: 4250 Sy - Remove Bituminous Trail 250 Cy - Excavation - Common (Ev) 240 Cy - Aggregate Surfacing (Cy) 1260 Sy - Asphalt Emulsion Seal Coat 1006 Ton - Type Sp 9.5 Wearing Course Mixture (2,b) 300 Sf - Concrete Pedestrian Ramp (6") 1 Ls - Traffic Control 300 Cy - Common Topsoil Borrow (Lv) 0.86 Ac - Turf Establishment (Including All Related Work and Appurtenances.) Question Deadline 08/22/2025 Any person contemplating the submittal of a Bid for the proposed Project who is in doubt as to the true meaning of any part of the Plans, Specifications, or other proposed Contract Documents, may submit to the Engineer a written request for an interpretation thereof at least seven (7) calendar days prior to the scheduled Bid Opening Bids must be on the basis of cash payment for the work and materials, and no bid will be considered unless sealed and filed with the City Engineer or his designee, and endorsed upon the outside wrapper with a brief statement of summary as to the work for which the bid is made, and accompanied by a cash deposit, certified check, or bidder's bond, payable to the City, for not less than 5%, as a guarantee that the bidder will, within TEN (10) days after notification of the award of contract, enter into an agreement with the City and furnish a bond for the full amount of the contract as provided by law. This deposit will be subject to forfeiture as provided for by law. Cash deposits, certified checks, and bidder's bonds of the three (3) lowest bidders may be retained until the contract has been awarded and executed, but not longer than 60 days from the date of opening bids. All other deposits will be refunded promptly. The City reserves the right to reject any and all bids, to waive any informalities therein, and to adjourn the meeting to a later date for the purpose of further consideration of the bids and taking action thereon. No bid may be withdrawn within 60 days from date of opening of bids. It is the City's intent for construction to begin after award, and work substantially completed by October 31, 2025.

Award

Roads / Highways

$242,892.00

Public - City

Paving, Site Work

11

16

16

6

Subscribe For Documents

21 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
253
Active Projects
136
Bidding Soon
1,527
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 4, 2025

September 29, 2025

Project location map

Multiple Locations, Blaine, MN

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.