Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published November 24, 2025 at 7:00 PM
Updated November 25, 2025
Renovation of a mixed-use development in Blaine, Minnesota. Completed plans call for the renovation of a municipal facility.
Plans call for the renovation of the first floor space at the Blaine Human Services Center. Question Deadline 10/17/2025 at 3:00 PM CT All questions regarding the protest should be directed to: Lindsey Felgate, Purchasing Manager 763-324-1735 or Lindsey.Felqate@anokacountymn.gov DESCRIPTION/BACKGROUND: The project consists of the construction of a remodeling of the first floor space at the Blaine Human Services Center for the Achieve Services program EXISTING BUILDING SYSTEM WORK SCOPE A. All existing control system components that are not incorporated into the finished system shall be removed. The extent of demolition shall include but not be limited to the following; pneumatic tubing and pnemnatic system components, control wiring, conduit and raceway systems, control cabinets, 120/1 volt power wiring, controllers, sensing devices, and actuators. System components that have been abandoned in previous projects shall be included in the demolition scope. Field verify the extent of demolition required. B. It is the intent to provide new direct digital controls for all new and to replace all ofthe existing controls and components for existing system that are shown to remain where allowed as described within each Control Sequence and Points Schedule, existing control systems and components may be revised at the Contractors discretion. Any control components that are re-used shall be functionally tested to provide they are in good working condition. Submit a report to the engineer. C. Protect all system wiring and control components in areas ofthe building that are renovated. Field verify conditions prior to work starting. Coordinate protection requirements with other trades. D. Special Pneumatic System Requirements: In renovated areas ofthe building where it is the intent that pneumatic systems will remain, cap all branch tubing at the nearest pneumatic main. Ifsystem leaks persist, as measured by the air compressor cycling, then new pneumatic main air shall be routed to each existing system
Award
Municipal
$198,400.00
Public - County
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 29, 2025
December 3, 2025
1201 89th Ave NE, Blaine, MN
Related To This Project
Blaine, MN
Bid Date: Sep 18 2025
Blaine, MN
--
Blaine, MN
Bid Date: Sep 25 2025
Blaine, MN
Bid Date: Oct 23 2025
Blaine, MN
Bid Date: Oct 29 2025
Blaine, MN
Bid Date: Nov 20 2025
Blaine, MN
Bid Date: Nov 25 2025
Blaine, MN
Bid Date: Nov 25 2025
Blaine, MN
Bid Date: Sep 04 2025
Blaine, MN
Bid Date: Aug 22 2025
Blaine, MN
Bid Date: Jul 24 2025
Blaine, MN
Bid Date: Jul 01 2025
Blaine, MN
Bid Date: Jul 02 2025
Blaine, MN
--
Blaine, MN
Bid Date: Jun 06 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
