BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 25, 2025 at 8:00 PM

Updated September 26, 2025

Site work and new construction of a transportation facility in Washington, Pennsylvania. Completed plans call for the construction of a 80,661-square-foot, one-story above grade transportation facility; and for site work for a transportation facility.

Freedom Transit Bus Facility Construction - General Construction - Multiple Primes The construction of the proposed facility and site development for Freedom Transit includes a multi-use building which includes offices, vehicle wash, maintenance operations and bus storage. The site work includes excavation, fill materials, site grading and landscaping, installation of stormwater basins, soil nailing, retaining walls and site development. Bids for the construction of the Freedom Transit Bus Storage and Maintenance Facility Bid packages will be received for the following contracts: GC - General Construction Contract Freedom Transit Encourages the Use of Disadvantaged Business Enterprise (Dbe) in All Contracts. Any Certified Dbe's Proposed by the Contractor Must Be Fully Utilized With Adequate Documentation Provided by the Selected Contractor to Satisfy Federal and Penndot Requirements. A Dbe Goal of 5.80% Has Been Established for Each Construction Phase Contract. Federal Prevailing Wage Rates Are Required for This Project. Freedom Transit Reserves The Right to Reject Any or All Bids. Question Deadline 09/16/2025 at 12:00 PM ET Questions must be submitted online. QA: One slab temperature sensor and one slab moisture sensor per each snow melt zone. One slab temperature sensor per each radiant heating zone. Sensors to be field located by contractor. Locate central to each zone. Bird screens not required. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Bid Results

Transportation Terminals

$28,327,000.00

Public - City

New Construction, Site Work

400

28

107

2

Subscribe For Documents

38 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
353
Active Projects
209
Bidding Soon
1,609
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 24, 2025

November 17, 2025

Project location map

375 Berry Rd, Washington, PA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.