Published September 11, 2025 at 8:00 PM

Updated September 12, 2025

Renovation of a water / sewer project in Birmingham, Alabama. Completed plans call for the renovation of a water / sewer project.

Pursuant to State of Alabama Code 41-16-54 this solicitation request is being issued to establish a contract with one or more qualified suppliers who will perform Air Scour Blower Replacement - Western Filter Plant of the Birmingham Water Works (hereinafter, "the BWW") as further described in this solicitation. Contractor must have the work substantially complete within 150 days of Notice to Proceed, with final completion due 15 days thereafter. Question Deadline 09/04/2025 at 5:00 PM CT All inquiries should be submitted in writing to the following: Jonathan Jett Jonathan.Jett@bwwb.org (email address) . Responses to questions given - September 5, 2025 at 5:00 p.m The right is reserved to reject any or all bids submitted, waive any informalities and technicalities, and award to the bidder deemed to best and most economically serve the Board's interests. The Board reserves the right to award a contract on an individual or total cost basis. The Board reserves the right to extend the contract, upon mutual consent of both parties, up to two (2) additional years. The Board reserves the right to cancel this Invitation to bid within thirty (30) days with written notice. The Board reserves the right to cancel the contract due to non-satisfactory performance or if the vendor is found to violate the terms and conditions or does not correct any violations of specifications within two days after being given notice. The Board reserves the right to resolicit. The Board reserves the right to enter a month-to-month contract once the contract has ended, at the current prices, until the next bid has been awarded with the mutual consent of both parties. Site visit description: Vendors wishing to view the site but unable to attend the scheduled pre-bid conference may make requests to schedule a site visit by emailing Jonathan.Jett@BWWB.org at least two working days prior to the proposed visit date. Requests for site visits will be determined on the availability of personnel and no guarantees are made that BWW will be able to allow site visits at the date and time requested. No site visits will be conducted after August 4, 2025. HUB (30%) 30245682-0203 Scope: 1. CONTRACTOR shall provide all labor, materials, equipment and incidentals as shown, specified and required to furnish and install packaged V-belt, rotary positive displacement blowers and appurtenances complete and operational as shown and specified. 2. Provide the following components with each blower: a. Blower. b. Electric motor. c. V-belt drive and equipment base. d. Sound reduction enclosure. e. Accessories.

Post-Bid

Water / Sewer

$1,497,100.00

Public - City

Renovation

6

4

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
89
Active Projects
40
Bidding Soon
593
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 11, 2025

November 10, 2025

Project location map

1400 Bankhead Hwy W, Birmingham, AL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.