BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 14, 2025 at 8:00 PM

Updated October 15, 2025

Site work and asbestos abatement for a fire / police facility in Lansing, Michigan. Completed plans call for site work for a fire / police facility; and for asbestos abatement for a fire / police facility.

Reference Number 0000395376 Asbestos Remediation Fire Station #8 Buyer Preferences, Guidelines & Requirements General Requirements - Bid Deposit Required - Certification/Training - Contractors License Required - Insurance Required - License Required - Local Service Required Award Requirements - All or None Award Bonding Requirements - Bid Bond 5 % A Bid Guaranty (in accordance with Federal Circular No. 570) in the amount equal to but not less than 5% of the total amount of the proposal shall accompany all bids. Certified checks, bank drafts, negotiable U.S. Government Bonds (at par value), Small Business Administration Guaranteed Securities, or a Bid Bond will be acceptable. (See page 3 of specifications for complete requirements for Bid Guaranty). Bonding agencies must be approved for doing business in the State of Michigan. No "off-shore" bonding agencies will be accepted. If you have any questions please contact Marilyn Chick , Senior Buyer, at (517) 483-4282 or email: Marilyn.Chick@Lansingmi.gov Technical questions should be directed to Roy Plowman @ (517) 483- 6034 The City reserves the right to accept any bids, to reject any or all bids and to make the award in the best interest of the City. A total of eighty-six (86) samples were collected of suspect asbestos-containing materials. The samples collected were from sixty-five (65) homogeneous area materials identified as part of this inspection. Of the homogeneous area identified, ten (10) were found to be asbestos containing. Additionally, BDN collected four (4) samples that were tested for chromium, cadmium, and lead. A table of the identified asbestos-containing and assumed asbestos-containing materials can be found in the tables of this report, as well as Appendix D Building Materials Summary – Asbestos. A copy of the analytical results for asbestos and heavy metal paint chips can be found in Appendix D Analytical Results – Asbestos and Appendix G Analytical Results – Heavy Metals, respectively. Scope of Work The project consists of removing all identified asbestos-containing materials within Fire Station 8. 5.1 Contractor Responsibilities 1. These project specifications are the responsibilities of the abatement Contractor. The Construction Manager or Consultant will approve in writing, prior to starting the project, any proposed deviations from these specifications. The information, which may be used to assist the Contractor in formulating his/her bid, is presented for informational purposes only and shall be verified by the Contractor or his/her representative at the time of the site inspection. 2. The Contractor will be responsible for removing all ACM within the work areas as identified in these specifications or found during abatement and demolition. 3. The Contractor is responsible for all selective demoltion that may be required to access known asbestos-containing materials. 4. The Contractor is required to coordinate any Lock out/ Tag out activities with the Construction Manager, if applicable. 5. The Owner will provide electrical power for the Contractor to connect to his electrical panel to power equipment. It shall be the Contractor's responsibility to ensure all equipment and circuits are properly isolated prior to the commencement of work. 6. All equipment used on this project shall be in good repair with no exposed wires or insulation. All plugs shall be equipped with a ground. Extension cords shall be rated for "hard surface" and shall have watertight connectors. tempered glass shall be used to protect the lamps. Exterior fixtures shall be used if exposed to moisture. 7. The Owner will provide a source of water for the duration of the project. The Contractor is responsible for the proper disposal of all wastewater generated on-site during the project to the sanitary sewer. All wastewater shall be properly filtered prior to dispos

Bid Results

Fire / Police

$12,965.00

Public - City

Asbestos Abatement, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

8

Subscribe For Documents

51 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
318
Active Projects
166
Bidding Soon
2,177
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 8, 2025

October 8, 2025

Project location map

815 Marshall St, Lansing, MI

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.