Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published December 23, 2025 at 7:00 PM
Updated December 24, 2025
Site work for a water / sewer project in Lansing, Michigan. Working plans call for site work for a water / sewer project.
"As per the Owner the Project has been cancelled. Editorial Content Team is actively seeking updated information" Cancellation Description The solicitation is being cancelled as of 22 December 2025 as this requirement will no longer move forward. Construction services are required for infrastructure improvements under the City of Lansing's Combined Sewer Overflow (CSO) Control Program. The project involves eliminating combined sewer overflows by constructing a new dedicated sanitary sewer and rehabilitating the existing combined sewer into a dedicated storm sewer. Work will be performed within a two-block section of S. Washington Square between Kalamazoo Street and Allegan Street, and a two-block section of Ottawa Street between Capital Avenue and Grand Avenue. All activities will occur within the existing right-of-way, with no real estate concerns. The scope includes abandonment of deteriorated CSO, cured-in-place pipe lining to convert CSO into storm sewer, installation of new sewer and water lines, lateral line connections to existing buildings to separate roof drains from internal sewer lines, traffic control planning, and demolition and replacement of pavement with concrete. Construction may involve substantial trenching and excavation up to 30 feet deep. Temporary access, staging areas, and structures such as turnarounds, storage areas, access roads, and office facilities may be required, all located within approved project boundaries and outside any properties listed or eligible for listing on the National Register of Historic Places. Contractors must comply with security requirements including initial and annual suspicious activity reporting training, E-Verify employment eligibility verification, and adherence to Force Protection Condition (FPCON), Random Antiterrorism Measures (RAMs), and Health Protection Condition (HPCON) protocols. All personnel and vehicles are subject to search when entering federal installations. In Accordance With Far 36.204, Disclosure of Magnitude of Construction Projects, the Magnitude of Construction for This Requirement is Between $5,000,000 and $10,000,000. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Scope of Work (SOW) USACE Detroit District is seeking construction services for infrastructure work as part of the City of Lansing's Combined Sewer Overflow (CSO) Control Program to eliminate combined sewer overflows via construction of a new, dedicated sanitary sewer and rehabilitation of existing combined sewer into a dedicated storm sewer. The project is located in downtown Lansing in a 2-block section of S. Washington Square between Kalamazoo Street and Allegan Street and a 2-block section of Ottawa Street between Capital Avenue and Grand Avenue. The project will take place in the existing right-of-way, with no real estate concerns. The Scope of Work includes but is not limited to: Abandonment of deteriorated CSO, cured-in-place-pipe lining of CSO to serve as a storm sewer, installation of new sewer and water lines, installation of lateral lines to existing buildings to facilitate separation of roof drains from sewer lines within buildings, traffic control plan, and demolition of pavement and replacement with concrete. The scope may include consideration for a substantial trench system through each section of work as well as excavation for a 30' deep hole. The proposed activities may require temporary access, staging areas, and/or construction of one or more temporary structures. Examples include turnarounds, work and storage areas, access roads, and office facilities. Temporary structures/staging sites would be at approved locations within project boundaries or rights-of-way, and would be located outside of any properties listed on or eligible for listing on the National Register of Historic Places. Identification of this Solicitation: Project Name: Section 219 - City of Lansing CSO Solicitation Number: W911XK25BA022 Bidder Inquiry Key: 7NP8KI-C7JGV2 Question Deadline 10/17/2025 All questions pertaining to this requirement shall be submitted in writing through electronically
Final Planning
Water / Sewer
$9,471,371.00
Public - Federal
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
