BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 3, 2025 at 8:00 PM

Updated November 7, 2025

Site work and renovation of a water / sewer project in Homestead, Iowa. Working plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.

ALL BIDS WERE REJECTED The project shall consist of providing all materials, equipment and labor necessary to install the work as defined as follows: Base Bid: Construction of 9'x7'x13' vault chamber with timber framed building including, metal siding and roofing, electrical, process piping, and HVAC systems. Provide and install UV Disinfection system as specified. Work includes all necessary grading, erosion control, mobilization water and natural gas service piping and other associated appurtenances and miscellaneous work items. All Work and equipment are to be in accordance with the Plans, Specifications and Contract Documents on file with the Homestead Sanitary District, Homestead, Iowa, which are by this reference made a part of this Notice as though fully set out and incorporated herein. Bid security in the form of a cashier's check or certified check drawn on a state-chartered or federally chartered bank, or a certified share draft drawn on a state-chartered or federally chartered credit union, or a bidder's bond with corporate surety satisfactory to the Board of Trustees, in the amount of 10% of the bid Work shall commence within ten (10) calendar days after receipt of the written "Notice to Proceed". All work shall be completed by September 1, 2026 subject to any time extension that may be granted by the Board of Trustees One hundred percent (100%) of the bid, with a maintenance period of three (3) years from the time of final project acceptance by the Owner. Monthly estimates equivalent to ninety-five percent (95%) of the Contract value of the work completed during the preceding calendar month with 5% retainage. Remaining retainage, if any, will be paid within 30 days after final acceptance by the Board of Trustees.

Final Planning

Water / Sewer

$500,000.00

Public - County

Renovation, Site Work

7

13

3

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
136
Active Projects
87
Bidding Soon
1,108
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.