BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 18, 2025 at 7:00 PM

Updated November 19, 2025

Site work and paving for a mixed-use development in Clermont, Florida. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

Project No. FPN #435541-3-54-01 Citrus Grove Road Phase 2 Construction The Citrus Grove Road Phase II project involves widening of Citrus Grove Road from a two-lane undivided roadway to four-lane divided urban roadway from 1,800 feet west of Scrub Jay Lane to 200 feet west of Grassy Lake Road. Total project length is approximately 4,177 feet (0.790 miles). The project consists of constructing four 12-foot travel lanes, 4-foot bike lanes, 22-foot raised median, a 5-foot sidewalk on the south side and a 12-foot multi-use trail on the north side. Roadway work will include milling and resurfacing existing roadway, construction of a new roadway (to include stabilization, base, asphalt), raised medians, curb and gutter, concrete sidewalk/trail, and driveway reconstruction. Guardrail is proposed for the curved section of roadway west of Scrub Jay Lane on the south side of Citrus Grove Road. Thermoplastic striping along with roadway signage will be placed. Drainage improvements include a closed drainage system requiring installation of storm pipe, curb inlets, ditch bottom inlets, mitered end sections and end walls. A dry pond is proposed at east of Scrub Jay Lane and south of Citrus Grove Road. A second pond is proposed west of Scrub Jay Lane and south of Citrus Grove Road. Other construction elements include mobilization, maintenance of traffic, erosion control, clearing and grubbing, excavation, embankment, and sod. All pedestrian facilities shall adhere to current American with Disabilities Act (ADA) standards. Utility coordination is required and has been coordinated. An environmental resource permit is being obtained for the project. The Contractor shall construct the project within the limits of the existing right of way or easements. Bids may be withdrawn prior to the date of opening, but no bids may be withdrawn for a period of sixty (60) days after the date of opening of bids. The Board of County Commissioners reserves the right to reject any or all bids, to waive formalities, and to award the contract in the best interest of Lake County, Florida. All bids must be accompanied by a Bid Guarantee acceptable to the County Attorney, which shall be one of the following; bid bond or letter of credit, in the sum of five percent (5%) of the base bid and made payable to Lake County. Said bid bond or letter of credit shall be a guarantee that should the bid be accepted, the bidder will, within ten (10) days after written notice of the award of the contract, enter into a contract with Lake County for the services proposed to be performed and will at that time furnish an acceptable contract surety. Cash, company or personal checks will not be accepted.

Bid Results

Roads / Highways

$10,747,474.00

Public - County

Paving, Site Work

177

10

10

5

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
402
Active Projects
185
Bidding Soon
2,680
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 9, 2025

November 3, 2025

Project location map

To Be Determined, Clermont, FL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.