Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published September 16, 2025 at 8:00 PM
Updated September 17, 2025
Site work for a road / highway in Cathedral City, California. Working plans call for site work for a road / highway.
**As of September 16th, 2025, no bids received. No definite date for the rebid.** The scope of work consists of furnishing all supervision and labor, materials, necessary equipment and tools required for the completion of the Project. The proposed project includes the fabrication, delivery, and installation of the Cathedrals Monument, composed of several metal pieces of varying properties. Installation will be coordinated with the City of Cathedral City and a designated contractor selected through a separate bidding process for the construction of the foundation for the monument. All project work and incidental items to complete the project shall be performed in accordance with the plans, specifications, and other provisions of the contract. The above scope of work is to be constructed in a workmanlike manner, leaving the entire project in a neat and presentable condition. (The location for Installation of the monument is a median located on East Palm Canyon Drive, between Date Palm Drive and Sungate Way.) The Fabrication portion of the project is to be completed within Ninety (90) calendar days from the date specified in the Notice to Proceed. The delivery and installation portion of the project will be coordinated at a later date, during the construction of the monument's foundation. Time for commencement and completion of the work is important and is to be of the essence of the Contract. The successful bidder should plan to order any long lead-time equipment items immediately following Notice of Award. The Contractor shall not begin any work before the issuance of the Notice to Proceed. Any Work that is done by the Contractor in advance of the Notice to Proceed shall be considered as being done at the Contractor's own risk and responsibility, and as a consequence will be subject to rejection. Bid security in an amount not less than ten percent (10%) of the total bid dollar amount and conforming to the prescribed bidding procedures is required to be submitted with each bid, as a guaranty to be forfeited should the bidder, if awarded the contract, fail to enter into the same, or fails to furnish in a timely manner the bonds and/or proof of insurance. The City reserves the right to reject any or all bids, and to waive any irregularities in the bids. The successful bidder will be required to furnish a Labor and Materials bond in the amount equal to one hundred percent (100%) of the Contract price, as well as a Faithful Performance Bond, in the amount equal to one hundred percent (100%) of the Contract price. Telephones will not be available to bidders. Bid forms received after the designated time will not be accepted. Bidders and their authorized agents are invited to attend. The City reserves the right to reject any or all bids, to waive any irregularity, to accept any bid or portion thereof, and to take all bids under advisement for a period of forty-five (45) days. No oral representations or interpretations will be made to any bidder as to the meaning of the Contract documents. Requests for an interpretation shall be made in writing and delivered at least ten (10) calendar days before the time announced for opening the bids to: Jesus Gutierrez Junior Engineer Attention: Engineering Department City of Cathedral City 68-700 Avenida Lalo Guerrero Cathedral City, CA 92234 jgutierrez@cathedralcity.gov
Final Planning
Roads / Highways
$700,000.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 28, 2025
March 16, 2026
E Palm Canyon Dr, Cathedral City, CA
Related To This Project
Cathedral City, CA
Bid Date: Sep 09 2025
Cathedral City, CA
Bid Date: Sep 04 2025
Cathedral City, CA
Bid Date: Feb 17 2026
Cathedral City, CA
Bid Date: Oct 07 2025
Cathedral City, CA
--
Cathedral City, CA
--
Cathedral City, CA
Bid Date: Nov 11 2025
Cathedral City, CA
--
Cathedral City, CA
--
Cathedral City, CA
Bid Date: Jul 24 2025
Cathedral City, CA
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
